Ok, In P3 I have my submittal’s made up for sorting with "Sub" in Area, and the Engineer’s review with the same area and also "Eng" in Item.
For my fabrication, I have "Fab" in area.
What I want to do is make a filter that basically gets me this.
When Item contains "Fab" & if the predecessor to that "Fab" has an actual finish, show both.
How do I do that???
For my fabrication, I have "Fab" in area.
What I want to do is make a filter that basically gets me this.
When Item contains "Fab" & if the predecessor to that "Fab" has an actual finish, show both.
How do I do that???