Actual Vs Planned Graphs in Suretrak
In the Open Standard
J HMember for 17 years 9 months
- Created
- 2
- 1
0
Sorry guys I posted this under a different category but, I need an answer ASAP.
Can someone please let me know how you overlay the Actual and Target curves onto the same graph in Suretrak. Vertical axis would most likely be manhours or if need be I could change it to cost.
Thanks
Can someone please let me know how you overlay the Actual and Target curves onto the same graph in Suretrak. Vertical axis would most likely be manhours or if need be I could change it to cost.
Thanks
2 replies
Oldest firstLog in or join to reply