ODBC ??

Sinan FahmiMember for 19 years 10 months
Created
5
30
0
Hi planners,
Recently I heared about ODBC driver which link P3 with Excel, I am intersting
to learn this feature, Could you send me the driver to install on my machine and
explain how does it work?

Thanks in advanced

5 replies

Oldest first
  1. 0
    Alex Wong ·
    Hi

    I highly suggested you learn the DB structure of P3 b4 you hook excel spreadsheet to the database.

    You can download the ODBC driver from the Primavera website (I think) if not just google it

    Regards

    Alex
  2. 0
    Paul Harris ·
    There is an article on my web sites explaining this process and the drivers are there too.

    Paul E Harris
    Eastwood Harris Pty Ltd, Melbourne, Australia
    Planning and Scheduling Training Manual & Book Publishers, Consulting and Training
    www.eh.com.au
    www.primavera.com.au
  3. 0
    A D ·
    Sinan,

    Before installing the ODBC Drivers from Pauls website, plz go through the read me file. Make sure drivers are suitable for Windows Xp or vista or whatever ur OS is.

    If ur OS is of higher version, then ODBC drivers can create lot of problem with P3 and u may need to reformat ur drive. So, be careful.

    These drivers were developed in 2000 or something like that and so, make sure ur current updated OS is compatible with these pervasive ODBC Drivers.

    u may find lot of threads here with this problem:

    http://www.planningplanet.com/forum/forum_post.asp?fid=&Cat=2&Top=7181

    Cheers,
  4. 0
    Sinan Fahmi ·
    Dear Paul,
    Could you guide me how to purchase a soft copy of your book (Primavera 6) from internet? is there any specific web site?

    Cheers
  5. 0
    Paul Harris ·
    I do not sell soft copies of my books as it is not possible to control their distribution effectively. So I currently only sell printed versions.

    The costs are on my web site at http://www.eh.com.au/bof.html The cost depends on what currency you wish to use and/or method of payment.

    My books are also available from:

    www.amazon.com
    www.eastwoodharrisbooks.com
    www.booksurge.com
    www.bn.com
    www.amazon.co.uk
    www.compman.co.uk

    Paul E Harris
    Eastwood Harris Pty Ltd, Melbourne, Australia
    Planning and Scheduling Training Manual & Book Publishers, Consulting and Training
    www.eh.com.au
    www.primavera.com.au

Log in or join to reply