Dear All,

When I am trying to istall my P3 software finally it is showing error message.

Error:[20]RECORD MANAGER INACTIVE
Operation: [14] CREATE
File:C\P3WIN\P3WORK\PRIMZFIL.p3

(yesterday I tried to install ODBC and then uninstalled it.

Please help me to overcome this problem.

With Thanks & Regards,

Anbin Ponnith

1 reply

Oldest first
  1. 0
    A D ·
    A lot has been discussed on this issue in this forum. U will find lot of threads with this issue.

    http://www.planningplanet.com/forum/forum_post.asp?fid=&Cat=2&Top=25415

    Nobody is sure with the solution and the best & quick way is to reformat the drives.

Log in or join to reply