How can change the date display type in P3.

Mch 714Member for 18 years 6 months
Created
4
1
0
Any PP, I want to change that date display type from 20/2/2010 to 20/Feb/2010. why date menu only have Arab number and not appeared English number in month.

4 replies

Oldest first
  1. 0
    Mike Testro ·
    Hi Mch

    It is old software so the numeric system applies - you are lucky to get 2010 visible.

    In Powerproject version 5 - some time ago - the date format was linked to the default windows set up but now you can set it to whatever configuration you want.

    Best regards

    Mike Testro.
  2. 0
    Mch 714 ·
    Hi Mike,
    Sorry! I wrote the status is in primavera - P3.1 Verson. whether is same changing on the default system of windows XP? I already try so doing but not change together with system of windows XP.

    Best regards

    Mch714
  3. 0
    Robin Reyes ·
    In P3, Click Format>Dates and then Select the date format you want.
  4. 0
    Mch 714 ·
    Hi Robin,
    In P3, Click Format>Dates and only appeared the date format for Arabic numerals(21-3-2010), but not had that I need type (21-mar-2010)on months.

Log in or join to reply