Longest path - No activties on layout
In the Open Standard
James BraghiniMember for 18 years 5 months
- Created
- 4
- 1
0
I just did a search and could not find an explanation, Hopefully some can. Here is the issue.
The previuos month when I ran the filter using Longest path, I would come up with activties. This month, when the schedule is updated and I run the filter, no activties come up for the longest path. The layout is blank. The data date is based on the current update.
Can someone tell me if I;m doing something wrong or is this just the way primavera looks at the predecssors and succesors in regard to total or free float?
Thanks,
James B.
The previuos month when I ran the filter using Longest path, I would come up with activties. This month, when the schedule is updated and I run the filter, no activties come up for the longest path. The layout is blank. The data date is based on the current update.
Can someone tell me if I;m doing something wrong or is this just the way primavera looks at the predecssors and succesors in regard to total or free float?
Thanks,
James B.
4 replies
Oldest firstLog in or join to reply