Hello all,

We have had some repeated requests to setup a forum area specially for those avid TILOS fans. So here it is.

TILOS is time-location planning software (also known as time-chainage software) that helps planning engineers in construction and civil engineering industries plan and manage linear construction projects such as road, rail, bridge, pipeline, power cabling, canal and tunnelling projects.

TILOS visually displays project plans in terms of both time and distance so planners can clearly see, for example, the status of a road build project in terms of what needs to be done on each section of the road and by when.

TILOS is the only system that combines the features of a drawing program and a project management system (including scheduling, resource and cost management). TILOS can exchange data with other scheduling systems including Microsoft Project, Primavera/P3, Excel and Asta Powerproject.

TILOS is a windows application that is installed on each PC. It is available as standalone and network version. For the network version, a licence is installed on a server to enable concurrent licencing.

87 replies

Oldest first
  1. 0
    Philip Jonker ·
    Hi Vlad,

    I am not quite clear on what you are saying, but have some sort of idea. Maybe it is time to market spider in a way that other people can see it, use it and maybe then understand it and appreciate it. The point is you tell us about it, but it remains an enigma, and we may be working with tools, that are outdated, and do not know it because the better tools are not at hand for us.

    Computor software is only as good as the markeying behind them, thus we are all stuck with Primavera, this is really a painful experience, as we hear rumours of better things, such as spider and power projects. Get out there and show us the power of the tools, so we can decide for ourselves, what is the best tools to use. Speaking for myself, the current tools take a lot of effort, and I am not a software guy, but an engineering professional who understands planning well, therefore I have a problem with continually having to learn the software problems and having to sort them out. As a good example, P3 was working very well without hassles and then the next "super version" could not perform half the tasks P3 could do. Prior to that we had Open Plan V4 dos, which was even better in some respects, but it was outdated by the advent of "Windows" and the supposed user friendlines, but the next release of Open Plan Professional became a total disaster, mightas well have been called closed plan.

    I think the problem is a combination of things,firstly there is not enough input of professional/active planners into the software development, secondly they are disregarding the freedom of planners, to produce reports and to check what is happeining in the databases behind the program.

    Lets get some real user friendly software back, where you do not have to be a software developer to write reports. And please then sell it at a competitive price, not at the exhorbitant fees that they do.

    Maybe if MSP tried this philosyphy they could develop a good product.

    Regards,

    Philip
  2. 0
    Vladimir Liberzon ·
    Hi Philip,
    thank you for the invitation but I don’t think that we have enough resources to promote our software around the globe. Today it is used in 14 countries though its largest markets are in Russia and Ukraine.
    Here we are famous for our customer support and I am sure that we can suggest the software to the mass market only in those countries where we have our branches or strong partners. But we will be glad to sell the software to the professionals from any country who know why they need Spider Project. We will help to use it properly and to achieve best possible results.
    As for price - I don’t think that you will pay attention to the software that is too cheap. So we are not cheap if you estimate the cost of the working version. But we supply our clients with the free and unlimited license for Spider Project Viewer that permits everything except changing project data. Usually these viewers are installed for 5 times more users than working versions (top management in particular). So you can divide the price of the license by 6.
    If you will download Spider Demo I will help to learn it.
    Best Regards,
    Vladimir
  3. 0
    Anoon Iimos ·
    Hi Philip and Vlad,

    Sorry for the late reply, i’m off on fridays. You are right Philip, the location is false, but the figure is quite correct and it’s very difficult to sort it out for various reasons (as explained below).

    Anyway, i’m just trying to figure out if the Time-Location Chainage Software might work at this point in time, and how long can it be established, as you know training for personnel to handle it will take time. And as you had mentioned, it will be applicable only for construction activities considering complete details to work out.

    What i’m trying to imagine is how can the software be dynamic given the condition that you are going to insert approved details from the basic information / diagram that you had established.

    regards,

    Anoon (also false)
  4. 0
    Anoon Iimos ·
    Philip,

    I agree with you that it’s difficult to set up a plan using a tool (software) that you’re not familiar with. And wondering why developers keep on changing softwares that you need to learn from scratch before you can use it a while and find out that it’s much worse than the one you’re familiar with.

    I believe when you said that inputs to develop these softwares must come from Planners, for Planning Principles never change, only technology changes.

    I guess most projects are one time endeavors, and to use a new tool (software) with the new project, is like doing trial and error. If the project goes down, so is the software.

    and business goes on...

    regards
  5. 0
    Vladimir Liberzon ·
    Anoon,
    please specify what do you mean by "how can the software be dynamic given the condition that you are going to insert approved details from the basic information / diagram that you had established."

    In our software (Spider Project) time chainage diagram (we call it Linear Diagram) is one of the standard project Views like Gantt Chart, Network Diagram or Resource Gantt. I don’t know but suppose that Tilos imports data from PM software and its data are dynamic too. I think that Philip will explain if your question will be more specific.

    Best Regards,
    Vladimir
  6. 0
    Anoon Iimos ·
    Vladimir,

    I mean Detailed Design Development is in progress (at this point in time), but there is basic design, which can give you a rough idea about the stretch of the line.

    I believe that Tilos doesn’t work in this condition. I’ll just settle for my T-square and triangular scale.

    regards
  7. 0
    Vladimir Liberzon ·
    If detailed design data will become available you will be able to input them into the project schedule. As the result you will get new diagram that shows current plan that have more details. Until then you can work with the data that you have.
    Simulating uncertainties is another task and Tilos will not help.
  8. 0
    Anoon Iimos ·
    "Simulating uncertainties is another task and Tilos will not help."

    ha ha ha, that’s why T-square and a scale will do.

    How will Spider work in this condition? I suppose it’s the same.
  9. 0
    Vladimir Liberzon ·
    Spider simulates uncertainties and risks.
    Regards,
    Vladimir
  10. 0
    Anoon Iimos ·
    Vlad,

    I believe Engineering / Design is full of uncertainties. So to set up a schedule with uncertain details is making a sporadic plan. Resources cannot be quantified.

    I forgot to mention that construction / operation goes parallel in a way, depending on the in-flow of approved details.

    The thing is, you might get stucked on a certain distance for a certain time without even knowing a bit of the succeeding activities.
  11. 0
    Vladimir Liberzon ·
    We usually create optimistic, most probable and pessimistic project scenarios that may include different activities, resources, costs.
    Basing on these estimates we define targets that may be achieved with reasonable probabilities and then control these probabilities trends.
    Parallel design and construction is usual, but not knowing a bit about future development is quite rare.
    We can discuss it in some other discussion - not in TILOS section.
  12. 0
    Anoon Iimos ·
    "We can discuss it in some other discussion - not in TILOS section."

    I’m not bias, as well as not too serious. But might be carried away by a good marketing strategy.
  13. 0
    Philip Jonker ·
    Hi Guys,

    Had a weekend break, with family visiting, and such, tried to ignore the more serious issues.

    Vlad, as for your first posting, I think it is possible to market in a wider perspective, as we have the internet, as their is so many possibilities with the internet, like interactive sites where somebody else can view your screen, and oppositely., videeo conferencing etc, that any problem can be sorted out within hours, if not within minutes for known problems. Even training can be dne in this way. Finding this type of personal interactive support is rare, as you have to answer all kinds of e-mails, some of which is computor generated, and nothing ever happens, so you just give up. As for price, I am not too worried about that, but if you pay the price, the quality of the software must justify it, in other words, do not sell something at a premium price if it is half baked (You may have an idea what I am talking about). I am not someone who uses software support too regularly, as in most instances I can find a work around, or some or other way to resolve the problem. This is specifically where I realise the software does not have the capability, however when you pay a premium,and have expectations about something, and you find major problems, and cannot carry out simple tasks, you get a bit peeved of, especially when there is virtually no way to talk to the developers, and they supply you with so-called patches, which resolvoves none of the issues they lay claim to. I do not want to go into this further, but things are getting a bit out of hand in the marketplace and other parties should step into the bereach if they have better solutions.
    I am so frustrated at present, about this, I can tear my hair out. I spent almost ten years on Open plan version 4 dos, and needed support twice, once we exceeded the maximum number of activities and got a extended version which meant simply driving 800km to got and collecting a sttify and loading it (these were the days before the days of the internet and fancy modems, I was on a remote site in the bush). With P3 I never had a problem serious enough to use support, but with OP professional I gave up, as the program was launched with too many problems. I contacted MSP once, and they sent out their expert (we paid a premium for him)who could not answer one of the questions we asked him, and said he would come back with answers, but we never heard from him again.

    What I am trying to say is that if the software is good it should not need major support, the question is more about shortcomings in the software in terms of capabilities, and this is where all good software developers stand out, in that if you point out such shortfalls, they will put these improvements in place. When you pay for maintenance when you buy software, you are not paying for the developer to fix his problems, but, for new developments and improvemts.

    Regards,

    Philip
  14. 0
    Philip Jonker ·
    Hi Anoon,

    I do not have a problem learning new software, and yes all projects are supposed to be unique, some are more unique than others, but the basic principle remain the same, cost, quality and time time remain the basic principles which set the uniqueness of a project, but, the real problem in most instances is time. I know that virtually every wedding can be qualified as a project, but, most of them are governed by budget (cost) and /or quality. However the serious projects, such as the space race, time was always the factor, obviously, quality as well, but you could always have a bit of a quality problem now and then as long as you were first in time. This is why it important for us to have good tools, that can give us forecasting information in good time, so that we can know how to win the race against time, we need effective tools, that does not take too long to work out where the problem lies and how to fix it. If you read my previous posting, you will have some idwa, where I am coming from. The problem I have is not the linear software, but the performance of the planning software. So to find out how to navigate software is a matter of hours, to find out how to work unstable software takes weeks, the linear software in this instance is not the problem, but part of the solution.

    regards

    Philip

  15. 0
    Philip Jonker ·
    Hi Guys,

    The point is that we need software that is stable and can run with minimal support, and if required quality support, 24/7/52/10, in other words all the time. I want software that can produce quality barchart, PERT diagrams, S-curves, Histogrammes, line of balance diagrams and any other analytical reports I need without add-ons, without the pain that is required by by most types of software. Compatability in software is also important, ie import and exports, without any exclucivity, thus creating an open market, where everybody can compete in terms of quality, support and the rest.

    This may not be the forum to have discussed this, but if some of the other subscribers, open their eyes, they might welcome this.

    It might be suggested to the PPAdmin, that they take cognisance of this, and duplicate some of these postings in a new forum about the shortfalls of planning software, and make software suppliers aware of this to improve the quality of service.

    Thanks for your support guys, especially Vlad, and hope you can expand as a result, as I have always been tempted by your Spider Projects. I think ASTA have also been refreshing in their approach, and let the best men/women win

    Regards All,

    Philip
  16. 0
    Vladimir Liberzon ·
    Philip,
    I agree with everything that you wrote.
    We are famous for our customers support. In the Russian version of Spider Project Help there is Technical Support item. Choosing it you will be moved to the Spider support forum. You can ask any question, you can suggest some improvement, you can report bugs, you can see what others asked and reported. This forum is open for everybody, not only for our customers.
    We are proud that the bugs are very rare but the forum is live and used for discussions of methodologies, rather complex solutions for simulating project resources, suggestions for future developments.
    Our customers wrote that they appreciated not only the software reliability but even more that reported bugs are corrected immediately - in a day or two we launch new version where reported bug does not exist. Our customers feel safe. I think that we are the only software developer that stated in the license agreement that we will correct any bug that will be discovered by our users.
    The software is continuously improved. We launch new version each month, new version means new features, not only corrected bugs.
    We plan to launch similar English forum soon because now we have many foreign customers. Until now you will be able to send E-mail within the program and you will receive a reply the same day.
    We encourage our customers to discuss with us Spider Project implementation, we are interested in the software proper usage. And we warn our customers that if they will think that Spider Project does not simulate something in your project ask us and we will explain how to do it. So we encourage our users not to find work arounds but discuss the problems with us. In most cases some features were overlooked.
    Today we are concerned with the amount of possibilities suggested by Spider. The software looks too complex. In one of the nearest versions we will add an option to switch on and off some functions to make interface more user friendly.
    But still I prefer face to face trainings.
    And local support is needed not for the software training and support but for project management consulting.
    Regards,
    Vladimir
  17. 0
    Andreas Ronczka ·
    Hi Vlad,

    maybe you ask PPadmin to open another forum for Spider project rather setting them into the TILOS thread?
    Anyhow, I agree in some words from you post, especially the face to face training. Doing it in this way gives customers always more benefit than e.g. web training. Problem here is that customers are sitting all over the world and expenses are higher that the training fee...
    You also wrote that you are proud that you produce new versions monthly. Well, in this case you are the number one enemy from all administrators in bigger companies. Even Microsoft has to learn that. What the IT responsible like to have is software that work, produce no issues and need no effort. Update means all time effort for them.
    TILOS had the same problem in past, to much releases, to much confusion, too much effort even for the support guys, fist question was always "which release do you use, ohhh, please visit website and update....". But ASTA promise to stop this.

    Finally, from my point of view I like to discuss more technical things here than promoting software or philosophic items.

    Regards,
    Andi
  18. 0
    Vladimir Liberzon ·
    Andreas,
    I just answer questions and suggest people who ask them to move the discussion to some forum.
    When we launch new release we supply it with the list of new functions and bugs that were discovered and eliminated. If some company does not need these functions and bugs appear only for some exotic situations they shall wait till the next release, etc. until they will decide that some new functions are useful for their projects. So IT people do not complain too much though yes, we know this problem.
    I agree that philosophic items and answers to the questions on another software shall be moved to some other forum like Planning, Scheduling & Programming Discussion. I could not ignore the direct questions but please ask them in some other forum. Maybe Planning Planet moderators will move these questions as Philip suggested in his post.
    Regards,
    Vladimir
  19. 0
    Charleston-Joseph Orbe ·
    Hi Guys,

    This is a great threads on planning ideas.

    Actually, I developed a planning information for high level management in LRT projects. It was based on the basic principle of communicating the plan that make it easy to be understood without heavy thinking.

    It is just a simple excel graphics that will straight away indentify the problems regarding viaduct construction. It shows the viaduct elements (piles, pile cap, pier, pier caps and segment installation).

    I used excel only (graphics, drawings, worksheets). It was very effective. I always bear in mind the philosophy of my friends here in PP regarding communicating the plans, where we stands, how we can move on, how long will special machines/equipment for viaduct construction will be on standby due to delays in precast elements.

    It is very straightforward that project teams acts on critical viaduct elements and activities, including activities at the precast yard.

    I can not share with you the files because this is a very high profile and live project.

    Anyway, i’ll try to develop project simulations, highlights the important events and share with you the pdf files

    Cheers,

    Charlie
  20. 0
    Philip Jonker ·
    Hi guys,

    Charles what is your problem, we have in excess of 10km of viaducts to erect on a live project. Why all the sececy, thought we are here to share ideas, so explain why you are trying to hide your ideas. Besides this I have 15km of tunnels and 15000000cub m of eartworks. so what is the point here, of talkingg to each other if not sharing ideas.I think, that PP Admin should give Spider projects their own forum, as I believe that power projects also has a forum, if not I think they need one. I believe there is much better software out there than the crap, we are being forced to use. In my opinion, software are tools we have to use, but the choice lies with the users. so therefore if the contracts that we sign with supliers is debateable, as the nonsense they are providing as patches, and as fixes are notworking. I therefore believe contractually they are in a problem are and I can lay claims against them in terms of hundreds of millions, does not matter the currency.That is why the field is open to new players, like ASTA and Spider. The performance of these companies have been so bad, it should wipe them out if normsl thinking persons banded together, shocking.

    Regards,

    Philip

  21. 0
    Charleston-Joseph Orbe ·
    Philip / Clive,

    I share your impression on me. Please understand that I have confidentiality agreement in my contract. So I cannot post something that will get back to me relating to "confidentiality clause in my work contract".

    I hope you will understand.

    I’ll try to work up something in pdf that will show what im talking about.

    As per Clive, I really believe what you said about communicating the plans. It should be effective communication of plan activities.

    Sometimes, I really wanted to shout on top of my voice or jump on top of project meetings to communicate what are the effective plan activities. This happened when site activities are not logical or daily activities were conducted as if project teams were to each his own agenda. It was so frustrating.

    In fairness, i will do something to show what i did.


    Regards,

    Charlie
  22. 0
    Philip Jonker ·
    Hi clive,

    Well put, if I had a choice, would change software tomorrow, unfortunately you get locked in by the costs involved and other factors such as the ease of converting data to other programs. this may not be the forum to discuss this, but you can maybe move this to another forum, such as the shortfalls of software. I am tied into Primavera because a decision ws made to go the route of PM v5. It took some time to work out how to link PMv5 to Tilos, without any assistance from Primavera. Asta had their input. The point I am getting to, is that Primavera, despite their their obvious domination of the marketplace as a result of P3 and the failure of OP Professional, have never had any input to this website. They have no commitment to planning and have their own ideas about what we should be doing in this respect1. In other words they have us in their trap and (I am trying to put this bluntly, but the rules of the site prevent me from frankly stating what my true opinion is) we need to walk away from this tender trap. I am speaking very frankly, avoiding the real words to pronounce what we need. Lets get to the facrs, PMv5, cannot even produce S-curves, print a calendar, and falls short by far of any planners expectations. The point I am making is that Asta, and Spider is so far ahead that PMv5 is living in terms of planning in the murkiness, in terms of Darwinism, in the great darkness, and if they had any brains within that organisation, would become an active partner.

    regards

    Philip
  23. 0
    Stephen Magill ·
    Hi all,

    Just spent a good hour reading this thread trying to get as much info on Tilos as possible. Gave up shortly after page 7 (when the discussion about the problems of scale and poor charlies sycophancy was in full swing.)
    A number of folk tried to redirect us back towards the original point but it would appear with no real success. (maybe i gave up just at the wrong time but couldnt really afford much more time reading the thread, as entertaining as it was).

    I am also a touch nervous to say anything here, in fear of being pigeonholed as a ’program jockey’ with no real planning skill and a heavy relyance on software to give me answers.

    Many of the responders in here have more years planning experience than i have been alive (27) and i have nothing but respect for those ’old school’ planners who had no choice but to do things the hard way. The thought of trying to reschedule a programme with 500 odd tasks after a month delay in one area is actually more than my mind can comprehend. where would you start?

    I would however like to add that although planning software does make things easier, it will never be able to replace the planner and the logical thinking he/she does. i think you always have to start with a pencil and ruler to get the basis of your programme down, the software merely makes checking and changing your logic much easier.

    i have been employed as a dedicated planner for 4 years working mainly on Healthcare Buildings and having little or no clue about civil or pipework projects.

    Recently i have been givin the oppourtunity to work on a large project with extensive motorway upgrading requirements as a 20% value of the job. I will myself be doing very little planning for the entire job, however the motorway contractor will no doubt be using Tilos or similar software. I am wondering about the presentation capabilities of Tilos and would be interested in seeing that A0 pdf you were talking about philip. It may well be that i will be working with the strategy planner and any ideas on how to usefully present a time-location plan to the client would be greatly appreciated. Ive applied to run the demo from asta and had a look at their examples on line but didnt find them that helpful.

    As i said, i have no experience of time-location plans and any ideas / suggestions on presentation techniques or which software does it best would be a great help.

    Thanking everyone in advance,
    Stephen
  24. 0
    Philip Jonker ·
    Hi Stephen,

    Do not feel lonely, with all this experience, I think I have to go and get a marketing degree, just to be able to sell the idea of planning in the correct perspective. People have all these weird perceptions about planning, such as it is the "black art of project management", which is strange in that all our crystal balls are flat LCD screens and do not remotely look anything like crystal. The other weird thing is that there is this sudden influx of so-called Project Managers, who qualified via various univercities/colleges, and seem to know it all, but cannot read a barchart, never mind understand the structure of programmes. Now we hit them with Tilos/time chainage, time distance, whatever you want to call it, and voila, after a bit of explanation, they grasp the concept, and become the masters of the universe. However, the barcharts are still mysterious documents which is beyond their grasp. The secret "black magic" knowledge good planners have is being able to read these mysterious documents. The unfortunate thing is that not all projects are open to linear diagrams, but somewhere out there is a solution. At least you got the grasp of the concept, in understanding that it can help you in terms of the motorway portion of your project. If you want some copies of the diagrams, my e-mail addres is philplan@iafrica.com . Let me know your address, and I will gladly send you some examples. Keep up the planning.

    Regards

    Philip
  25. 0
    Raja Izat Raja Ibrahim ·
    Hi Philip,
    Where are you.... miss your sharp words. Any new function or news regard TILOS, since six month i got sample from you. Surely got the tune to find the pro and con of the software which you can share with us.

    Regards
  26. 0
    Philip Jonker ·
    Hi Raja,

    Have lots to say, but time is few. Tilos is a good tool for finding problems withim the schedule, but it lacks speed, somewhere somebody has to produce a homogenous product, where everything is done by the click of a button, besides which I am short of resources, so if you are interested, contact me. It is interesting timeshere, and the experience will serve you greatly.

    Regards,

    Philip
  27. 0
    Ewan Lindsay ·
    Hi Philip
    I have only just seen this forum so have only been brought up to speed on the discussion.
    Something which has puzzled me is why you opted for Tilos and not Site Plan which would have been integral with the CCS estimating package.
    I used their package four years ago and although fairly basic at that time still gave a presentable time chainage solution and is reasonably fast.
    Knowing how quickly they develop I am sure by now it will be a very good package.
    Regards

    Ewan
  28. 0
    Philip Jonker ·
    Hi Ewan,

    The answer is very simple, and very complicated. the original programmme at the proposal stage was done in CCS, due to several factors it was decided to use Primavera. At the time Primavera anounced they were abolishing P3 in 2007, and that Primavera PM v5, was the new answer, a decision was made to use this. In the meantime a time distance tool had to be found that could work in tandem with PM v5, we looked at several (3) and after some tests decided on Tilos, which is doing good work, however, PM v5 is not the most stable program in the universe, and it it has a number of shortfalls, so Tilos is fine, but reporting is a major problem. As you know it is a multi national project, and everybody has their own languages, perceptions, etc. And with CCS being a favourite, amongst some of the individuals it features. It is an interesting conundrum, and we are searching for solutions.

    If you are on skype or simular, let me know, and we could have an interesting chat.

    Regards,

    Philip
  29. 0
    Mia Ng ·
    Hi guys,

    Thought I ping back this topic since it’s more than 1 year now. My company is looking for the possibility of using Tilos to produce time chainage programme. Could anybody tell me if it is possible to import a P6 programme (.xer file) into Tilos (or vice versa)? Many thanks
  30. 0
    Mike Testro ·
    Hi Mai

    Send your email to support@astadev.com and they will tell you by return.

    You can import p3 to PowerProject and back again so maybe you can with Tilos.

    Best regards

    Mike Testro
  31. 0
    Alexandre Faulx-Briole ·
    Mai and Mike,
    Ulos can import P3 files and export to P3 format
    See http://www.astadev.com/software/tilos/overview.asp
    Therefore you will be abel to exchange data between Tilos and PM6 via P3 files; you do not have to have P3 instaleld for that.
    Alexandre
  32. 0
    Tu Huynh Van ·
    Hi Mai,

    Another way, you can export P6 to excel file (xls), and then xls . . .to Tilos.

    Cheers
  33. 0
    Mia Ng ·
    Oh you guys are so helpful. Thanks alot.

  34. 0
    Dave Crosby ·
    Hi Mai,

    In TILOS there is more than one way to import data from an Excel file. One way requires a add-on. If your data is coming from P6 I suggest you look at the Excel add-on.

    Regards,

    Dave.
  35. 0
    Punit Patel ·
    hello dave,
    i am looking for TILOS Software , could u suggest from where can i get it
  36. 0
    Mike Testro ·
    Hi Punit

    Its from the same people who produce PowerProject:

    Asta Developments - you can google Asta to get to their website.

    Best regards

    Mike Testro
  37. 0
    Dave Crosby ·
    Actually this not strictly true. It is distributed in the UK by Asta Development, but it is actually from a German company.
    You can find their web site here:
    http://www.tilos.org/

    Just to confuse you they used to call themselves Asta Development (Germany) but they have now changed their name to "Linear Project".

    Kind regards,

    Dave.