| Activity | Entry (verbatim) | Value | Source |
|---|---|---|---|
| Traffic Decking | Installation of temporary traffic decking, consisting of steel beam decking and concrete panels. A typical rate of = 1.6 m2/hr. | 1.6 m2 per hrper hrParsed | Traffic Decking |
1–1 of 1
These values were contributed by members and reflect the conditions, methods and regions they worked in. They are a starting point for estimating, not a standard. Check them against your own records, the site conditions and the contract before relying on them.