Open Standard · M2 Planning & Scheduling
M2.3 Resources, Productivity & Schedule Optimisation
Knowledge
Articles and chapters
- M2.3 — Resources, Productivity & Schedule Optimisation17 Oct 2026
1. Practical outcomeBy the end of this section, the learner should be able to test whether a logically valid schedule is actually deliverable with the people, skills, equipment, facilities and other constrained resources available to the project. They should be able to distinguish resource demand…
- Cable Car18 Dec 2025
The 21 months duration for the 14km cable car project from the land available date is made up of the following activities:
Rates, Norms & Durations
- Building & Construction20 Dec 2023
Building & Construction Production Middle East Rates & Build Times:
Rates, Norms & Durations
- Bridge Items - Work Activity Base Production Rates in USA11 Jan 2021
Rates, Norms & Durations
- 17 Jul 2019
- Rates, Norms & Durations16 Jun 2016
What is needed to come up with a production rate?A duration of time, the manhours involved, and an amount of work produced?This section is here to document this. What information do you have that you can share?
Rates, Norms & Durations
- 28 May 2016
- 12 May 2016
- 26 Dec 2015
- Pipeline Construction14 May 2013
Pipe welding is not that straight forward. You have a number of welding passes to take into consideration, then NDT and finally hydrotesting. I worked on a pipeline construction project in Iraq and used the following formulae to work out duration for the welding.The average welder can complete about
Rates, Norms & Durations
Discussions
Discussions
No discussions tagged yet
Discussions appear here once a topic is linked to this subject.
Blogs
Thought leadership
- PROCEDURES No 15 – Planning Standards10 Aug 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
Jobs
Roles asking for this
No live jobs tagged yet
Jobs appear here once a recruiter links the role to this subject.
Norms & Rates
Rates, norms and durations
| Activity | Entry (verbatim) | Section | Source |
|---|---|---|---|
| 005 Initiate Phase | IT Engineering Projects | 005 Initiate Phase | |
| 010 Analyse Phase | IT Engineering Projects | 010 Analyse Phase | |
| 015 Design Phase | IT Engineering Projects | 015 Design Phase | |
| 020 Develop Phase | IT Engineering Projects | 020 Develop Phase | |
| 025 Test Phase | IT Engineering Projects | 025 Test Phase | |
| 030 Implement Phase | IT Engineering Projects | 030 Implement Phase | |
| 035 Support Phase | IT Engineering Projects | 035 Support Phase | |
| Aluminium Roofing | Aluminium Roofing Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Flat Roof Aluminium Work = 2.8 m2/day Sloping Roof Aluminium Work = 1.9 m2/day | Metal Roof Decking | Aluminium Roofing |