M2.3 Resources, Productivity & Schedule Optimisation

By the end of this section, the learner should be able to test whether a logically valid schedule is actually deliverable with the people, skills, equipment, facilities and other constrained resources available to the project. They should be able to distinguish resource demand from capacity, derive realistic activity durations from quantities and productivity, identify overloads and bottlenecks, understand the difference between smoothing and levelling, develop practical optimisation options, and explain the time, cost and risk consequences of those options.
264 knowledge pages1 blogs202 normsRead M2.3 in the Open Standard text

Knowledge

Articles and chapters

  • M2.3 — Resources, Productivity & Schedule Optimisation

    By the end of this section, the learner should be able to test whether a logically valid schedule is actually deliverable with the people, skills, equipment, facilities and other constrained resources available to the project. They should be able to distinguish resource demand from capacity.

    21 Oct 2026
  • M2 — Planning & Scheduling

    Module 2 establishes the essential practices for developing, managing and controlling credible project schedules. It explains how to translate project scope into a structured schedule, establish logical relationships, identify critical and near-critical paths, and understand float and milestone dependencies. It also covers how to assess resource availability, productivity and delivery constraints, optimise schedules, and maintain accurate progress updates using objective evidence. Finally, it explains how to analyse schedule performance, forecast likely completion dates, identify emerging risks and evaluate recovery options. Together, these practices provide a reliable foundation for understanding project timelines, monitoring delivery performance, anticipating delays and supporting informed decisions to keep projects on track.

    21 Oct 2026
  • Cable Car

    The 21 months duration for the 14km cable car project from the land available date is made up of the following activities:

    Rates, Norms & Durations

    18 Dec 2025
  • Building & Construction

    Building & Construction Production Middle East Rates & Build Times:

    Rates, Norms & Durations

    20 Dec 2023
  • 11 Jan 2021
  • Basement Excavation

    Basement Excavation

    Rates, Norms & Durations

    17 Jul 2019
  • Rates, Norms & Durations

    What is needed to come up with a production rate?A duration of time, the manhours involved, and an amount of work produced?This section is here to document this. What information do you have that you can share?

    Rates, Norms & Durations

    16 Jun 2016
  • Drainage, Manholes and Gulleys

    Manholes and Gulleys

    Rates, Norms & Durations

    28 May 2016
  • Excavate & Reduce Levels

    Excavate By Hand Trenches (m3/hr)

    Rates, Norms & Durations

    12 May 2016
  • Blockwork

    Blockwork

    Rates, Norms & Durations

    26 Dec 2015

Discussions

Discussions

No discussions tagged yet

Discussions appear here once a topic is linked to this subject.

Blogs

Thought leadership

  • PROCEDURES No 15 – Planning Standards

    Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…

    PP Admin

    10 Aug 2026

Jobs

Roles asking for this

No live jobs tagged yet

Jobs appear here once a recruiter links the role to this subject.

Norms & Rates

Rates, norms and durations

ActivityEntry (verbatim)
005 Initiate Phase
010 Analyse Phase
015 Design Phase
020 Develop Phase
025 Test Phase
030 Implement Phase
035 Support Phase
Aluminium RoofingAluminium Roofing Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Flat Roof Aluminium Work = 2.8 m2/day Sloping Roof Aluminium Work = 1.9 m2/day