Rates, Norms & Durations / Fitout & Finishes / Painting & Decorations
Timber
1 entrySource page: Timber
Subjects on this page
| Activity | Entry (verbatim) | Source |
|---|---|---|
| Internally | (Rates per coat unless stated otherwise) One coat primer, before fixing generally 6.70 m2/hr One coat primer, before fixing lengths 20.0 m/hr Knot, 1 primer, stop, 1 undercoat, 1 gloss 1.75 m2/hr Touchup primer, 1 undercoat, 1 coat gloss 3.10 m2/hr Polyurethane varnish - 2 coats 3.30 m2/hr, - 3 coats 2.20 m2/hr Linseed Oil to Hardwood, 2 coats 3.30 m2/hr7 rate statements found; left for an editor | Internally |
1–1 of 1
These values were contributed by members and reflect the conditions, methods and regions they worked in. They are a starting point for estimating, not a standard. Check them against your own records, the site conditions and the contract before relying on them.