Contractor’s delays
In the Open Standard
Ahmad AlbirawiMember for 18 years 2 months
- Created
- 14
- 6
0
Dear PP members
I’ve this question floating in my mind. how we can catch contractors delays?
I mean, lets assume that a contractor is on delay for instance 2 month and we give him an instruction to change some small works or a revised drawings in a stage that we know that he in delay and these revised works won’t take just 4-5 days work. then the contractor came with EOT claim effecting from the date of the instruction. the Impacted as planned methodology analysis will give him for sure EOT 2 month + 5days job which is not fair as I see. at the same time TIA method is not applicable due the EOT is submitted after the works is done. shall we use at this time As-Built vs. As-Planned method. please bear in mind the project is still running and the contractor keep asking for prolongation costs due to his extended period project
Regards
AA
I’ve this question floating in my mind. how we can catch contractors delays?
I mean, lets assume that a contractor is on delay for instance 2 month and we give him an instruction to change some small works or a revised drawings in a stage that we know that he in delay and these revised works won’t take just 4-5 days work. then the contractor came with EOT claim effecting from the date of the instruction. the Impacted as planned methodology analysis will give him for sure EOT 2 month + 5days job which is not fair as I see. at the same time TIA method is not applicable due the EOT is submitted after the works is done. shall we use at this time As-Built vs. As-Planned method. please bear in mind the project is still running and the contractor keep asking for prolongation costs due to his extended period project
Regards
AA
14 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?