Links between multiple projects
In the Open Standard
Bob FodenMember for 19 years
- Created
- 7
- 4
0
Hello all. I’m a virgin to the site so bear with me if I contravene any protocols.
The problem I have is that my client does not want to invest in MSP Server but I have to manage a number of separate plans. These have logic links between them. When I make a change to a plan name (ie revision update) I then lose the links (not unsurprisingly). Is there a way to get MSP to easily recognise the changes or, preferably automatically make them ?
Thanks
Bob
The problem I have is that my client does not want to invest in MSP Server but I have to manage a number of separate plans. These have logic links between them. When I make a change to a plan name (ie revision update) I then lose the links (not unsurprisingly). Is there a way to get MSP to easily recognise the changes or, preferably automatically make them ?
Thanks
Bob
7 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?