In P6 import/export P3 option disabled

Ananda VijayanMember for 18 years 5 months
Created
8
1
0
Hi friends,

In primavera 6.2 import/export primavera project planner p3 option disabled and all other options enabled. I want to enabled p3 option.

Kindly help the above matter.
Thanks & Regards,
VJ

8 replies

Oldest first
  1. 0
    Arnold Puy ·
    Hi Ananda,

    Try this link:

    http://www.planningplanet.com/forum/forum_post.asp?fid=1&Cat=8&Top=66623

    I don’t know why is this happening. But in my case, I didn’t encounter this kind of dilemma.

    Regards,

    Arnold
  2. 0
    Ferdinand U. ·
    i red before that you need to install first p3 before p6.2 to have it worked

    just forgot where i red it
  3. 0
    Ronald Winter ·
    I believe that instead of the older “push” system where P6 creates P3 files, you now have to “pull” by creating an XER backup file and then running the new program that converts an XER into P3 files. Look for that program in the distribution program files. You give that program to your P3 owner to use.

    The “push” system still works if you have both P3 and P6 installed on the same computer. I have no idea what drove Primavera to fix something that wasn’t broken. Good luck!
  4. 0
    Ananda Vijayan ·
    Thanks Arnold and all helping friends.

    Regards,
    VJ
  5. 0
    Genie Regodos ·

    The problem is you can't

    The problem is you can't install P3 in 64-bit Windows operating systemand my P6 is 64-bit, how will it import my PRX file to P6?

  6. 0
    Genie Regodos ·

    The problem is you can't

    The problem is you can't install P3 in 64-bit Windows operating systemand my P6 is 64-bit, how will it import my PRX file to P6?

  7. 0
    Genie Regodos ·

    Yes, but only if you have

    Yes, but only if you have 32-bit P6 Professional installed in a 32-Bit Windows XP in which the old 32-Bit P3 is installed. But the problem is Most computer is running in Windows is 64-bit and you cannot install p3 in 64-bit machine. Thats my problem too. I have P6 Prtofessional in my Windows 7 Home Premium (64-bit) cannot install P3, so import/export is "grayed" or disabled. I am exploring if i could go upgrade to Windows Ultimate that can able to rune Windows XP mode virtually, then install p3 in virtual XP. I am not sure if i'll do it, i will be able to import/export prx to P6 Professional.   Anybody have done this?

  8. 0
    Genie Regodos ·

    Yes, but only if you have

    Yes, but only if you have 32-bit P6 Professional installed in a 32-Bit Windows XP in which the old 32-Bit P3 is installed. But the problem is Most computer is running in Windows is 64-bit and you cannot install p3 in 64-bit machine. Thats my problem too. I have P6 Prtofessional in my Windows 7 Home Premium (64-bit) cannot install P3, so import/export is "grayed" or disabled. I am exploring if i could go upgrade to Windows Ultimate that can able to rune Windows XP mode virtually, then install p3 in virtual XP. I am not sure if i'll do it, i will be able to import/export prx to P6 Professional.   Anybody have done this?