P6 Error
In the Open Standard
Ife OlykeMember for 19 years 8 months
- Created
- 2
- 2
0
Folks, who's got a clue how I can solve this problem... Thanks
- I imported a ver 6.7 project file into ver 6.2; it imported ok
- I tried to import some layout files (.PLF file) and got the error message ‘[QT_DAY=5]’ is not a valid floating point value with an option to 'OK'
- Clicked 'OK' and P6 was shut down
- Restarted P6 and got error message: Exception EConvertError in module PM.exe at 0000AC7E. ‘[QT_DAY=5]’ is not a valid floating point value
- Uninstalled and reinstalled P6 on the computer and still got the same error message: Exception EConvertError in module PM.exe at 0000AC7E. ‘[QT_DAY=5]’ is not a valid floating point value
2 replies