Report sent to us by consultant
- Created
- 4
- 1
Dear All,
Our consultant commented the schedule,and sent us PDF files incorporating his ccomments in very short time.
I tried to take copy and past it herunder,but I don not know wich program /software he has used?
Can any body tell me?
SUCCESSORS REPORT
1 CPL.B1.Z1.04CO088 CPL.B1.Z1: STORE ROOM BLOCK WORK 24 30-May-10 23-Jun-10 28
CPL.B1.Z1.08CO919 CPL.B1.Z1:Pkg J.1 Store Room Door Installation 2 22-Sep-10 23-Sep-10 FS 0 12
CPL.AL.AL.01PM001 CPL.AL.AL: ZONE/SHOP READY FOR TENANT FITOUT (MILESTONE) 0 31-Jan-11 FS 0 0
2 CPL.B1.Z1.04CO089 CPL.B1.Z1: SERVICE CORRIDOR BLOCK WORK 18 30-May-10 17-Jun-10 28
CPL.AL.AL.01PM001 CPL.AL.AL: ZONE/SHOP READY FOR TENANT FITOUT (MILESTONE) 0 31-Jan-11 FS 0 0
CPL.B1.Z1.08CO915 CPL.B1.Z1:Pkg J.1 Service Corridor Door Installation 2 22-Sep-10 23-Sep-10 FS 0 12
3 CPL.B1.Z1.04CO091 CPL.B1.Z1: MALE WASH ROOM BLOCK WORK 30 30-May-10 29-Jun-10 28
CPL.AL.AL.01PM001 CPL.AL.AL: ZONE/SHOP READY FOR TENANT FITOUT (MILESTONE) 0 31-Jan-11 FS 0 0
CPL.B1.Z1.07CO950 CPL.B1.Z1: Pkg H Site Preparation 7 18-Jul-10 24-Jul-10 FS 0 162
CPL.B1.Z1.08CO926 CPL.B1.Z1:Pkg J.1 Male Wash Room Door Installation 2 29-Sep-10 30-Sep-10 FS 0 5
4 CPL.B1.Z1.31CO140 CPL.B1.Z1: BACK FILLING & COMPACTION 62 11-Mar-10 12-May-10 103
CPL.B2.Z1.15COA60 CPL.B2.Z1:Pkg G.1 Fix Reverse Osmosis Pipes From Borewell To Pumps 7 03-Sep-10 09-Sep-10 FS 0 53
EXT.AL.NO.15COA25 EXT.AL.NO:Pkg G.1: Drilling Bore Well 15 12-Jul-10 26-Jul-10 FS 0 43
EXT.AL.SO.15COA65 EXT.AL.SO:Pkg G.1:Drilling Bore Well 14 19-Jul-10 01-Aug-10 FS 0 50
5 CPL.B1.Z2.04CO088 CPL.B1.Z2: STORE ROOM BLOCK WORK 24 21-Apr-10 15-May-10 44
CPL.B1.Z2.08CO919 CPL.B1.Z2:Pkg J.1 Store Room Door Installation 2 22-Sep-10 23-Sep-10 FS 0 12
6 CPL.B1.Z2.04CO089 CPL.B1.Z2: SERVICE CORRIDOR BLOCK WORK 18 21-Apr-10 09-May-10 50
CPL.B1.Z2.08CO915 CPL.B1.Z2:Pkg J.1 Service Corridor Door Installation 2 22-Sep-10 23-Sep-10 FS 0 12
7 CPL.B1.Z2.04CO095 CPL.B1.Z2: LOW VOLTAGE BLOCK WORK 24 30-Apr-10 24-May-10 66
CPL.B1.Z2.08CO888 CPL.B1.Z2:Pkg J.1 Low Voltage Door Installation 2 22-Sep-10 23-Sep-10 FS 0 31
CPL.B1.Z2.07CO950 CPL.B1.Z2: Pkg H Site Preparation 7 25-Jul-10 31-Jul-10 FS 0 162
8 CPL.B1.Z2.04CO096 CPL.B1.Z2: HIGH TENSION ROOM BLOCK WORK 24 30-Apr-10 24-May-10 66
CPL.B1.Z2.07CO950 CPL.B1.Z2: Pkg H Site Preparation 7 25-Jul-10 31-Jul-10 FS 0 162
CPL.B1.Z2.08CO666 CPL.B1.Z2:Pkg J.1 High Tension Room Door Installation 2 22-Sep-10 23-Sep-10 FS 0 31
9 CPL.B1.Z2.04CO097 CPL.B1.Z2: TRANSFORMER ROOM BLOCK WORK 24 30-May-10 23-Jun-10 5
4 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?