Design Deliverable Planning

Shaiju PvMember for 10 years 11 months
Created
3
20
0

I have project which consists of quite a large  number of drawings.My cliet asked me to incorporate all drawings in the design and deliverables part of the project. Since i have to link all(majority of ) the drawing to construction part and each drawing will go for  two or three revisions from client how do i link to the construction part .

In short :

1. I have drawings, some of them will undergo 2 reviews,some of them will have 3 or more .

2.In this situation how do we link the drawing to the construction

Thanks and regards,

Shijau

 

3 replies

Oldest first
  1. 0
    Zoltan Palffy ·

    design drawings to 30%, then

    design drawings to 30%, then client review 30% drawings then 

    design drawings to 60%, then client review 60% drawings then 

    design drawings to IFC%, then client review IFC drawings then 

    create/submit shop drawings, client review/aprrove shop drawings then

    Procurement of whatever material then

    install the material

  2. 0
    Shaiju Pv ·

    Thank you very much

    Thank you very much sir

     

    shaiju

  3. 0
    Zoltan Palffy ·

    glad I could help

    glad I could help