Contiguous piling outputs
In the Open Standard
Hervé de TrogoffMember for 21 years 3 months
- Created
- 2
- 5
0
Good morning all,
I am after some very specific piling output rates (in hrs per pile per rig), and was wondering whether anyone has data on the following:
- Type of pile: contiguous bored piling
- Dimensions: 1000mm Dia x 15.0m Length
- Methodology: rotary bored pile in cohesive soil (no stell casing)
I couldn’t quite find this info on the production rates available on the web site.
Any clue or historical data close to the above specs would help! Many thanks.
Hervé
I am after some very specific piling output rates (in hrs per pile per rig), and was wondering whether anyone has data on the following:
- Type of pile: contiguous bored piling
- Dimensions: 1000mm Dia x 15.0m Length
- Methodology: rotary bored pile in cohesive soil (no stell casing)
I couldn’t quite find this info on the production rates available on the web site.
Any clue or historical data close to the above specs would help! Many thanks.
Hervé
2 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?