New Austrian Tunneling Method - Productivity Parameters

Ashish AbrahamMember for 19 years 10 months
Created
1
4
0
Does anyone have any input about productivity numbers for the New Austrian Tunneling Method (NATM)? Any help would be greatly appreciated!

Thanks.

1 reply

Oldest first
  1. 0
    Paul Harris ·
    These would depend on a number of factors such as type of rock, stratification, slope, size and depth of tunnel, water ingress, method of excavation etc.

    NATM is a design and construction monitoring methodology not a production based estimating process.

    Paul E Harris
    Eastwood Harris Pty Ltd, Melbourne, Australia
    Planning and Scheduling Training Manual & Book Publishers & Consulting
    www.eh.com.au

Log in or join to reply