Activity Network Schedule with TimeScale

Govinda MadasseriMember for 18 years
Created
2
2
0
I want to create an Activity Network Schedule with a TimeScale on top and with the Nodes distributed along the length of the timescale as per their start dates.

Is this posssible in Primavera-P6.1 or MS Project? If not possible is there any other software with which this is possible.

In earlier Primavera versions, I understand there was a provision for a layout called ’Pure Diagrams’ . This option is no longer available I presume.

Would appreciate help. If there is any other software available, kindly let me know where I can get them?

Thanks.
Govinda

2 replies

Oldest first
  1. 0
    Iftikhar Awan P.Eng. ·
    Try the link below:

    http://www.zdnetasia.com/downloads/pc/swinfo/0,39043052,39097118s,00.htm

    Hope it helps.
  2. 0
    Govinda Madasseri ·
    Thank you very much.

    It certainly helps.

    Govinda