Scaffolding Estimation
In the Open Standard
Mandar KulkarniMember for 19 years 7 months
- Created
- 4
- 3
0
I am working on an assignment for estimating scaffolding requirement. Type of scaffolding being used is Cup Lock system of scaffolding. I need to prepare a formula in excel so that if height and length of wall is given then we should be able to calculate the external scaffolding requirement for doing plastering,painting Etc. i.e No. of standards, ledgers and braces etc. Can any body guide me on this issue.
Thank you.
Thank you.
4 replies