Engineering Plan guidelines

Peter NauendorfMember for 20 years
Created
3
1
0
I am looking for a procedure or guidelines for preparing and Engineering schedule from Feasability through to Exection phase. I have some basic flowcharts but would like to have something with a bit more detail that I could use straight away.

Peter N.

3 replies

Oldest first
  1. 0
    Shah. HB ·
    Hi Peter

    Check this link you might get few tips

    http://www.wfl.fhwa.dot.gov/design/process/Process_Flowchart.pdf
  2. 0
    Peter Nauendorf ·
    Thanks Shahul the document is exactly what I was looking for.
  3. 0
    Shah. HB ·
    Hi Peter

    Then cool,use it well