RC FRAME

James YoungMember for 18 years 4 months
Created
1
3
0

Morning all,

Has anyone got a detailed sequence of works for a insitu concrete frame along with a guide to the duration?

Regards

James

1 reply

Oldest first
  1. 0
    Samer Zawaydeh ·

    Dear James, Sorry for the

    Dear James,

    Sorry for the late reply. But it depends on the type of job that you have. If you have a small operation, then you can complete the surveying works, shuttering, and reinforcement and then ask the Engineer for checking the reinforcement before closing the shuttering. On the other hand, if you have a big project and an ITP (Inspection and Test Plan) that you want to abide by, then you will have to complete each step as per ITP and submit it for inspection per requirements.

    The size, location, enviornmental factors, and resources that you have are some of the factors that determine the rate of progress at site.

    With kind regards,

    Samer