25% PFS and 10% BFS Schedule templates

Dawie du PlessisMember for 17 years 6 months
Created
0
2
0

I was wondering if there is anybody out there that has got standard templates for a 25% Pre-Feasibility Study and a 10% Bankable Feasibility Study? We are setting up a new project in South Africa and I need to train a junior Planner but do not have all the time in the world to do that and be doing my projects schedules. I am busy developing a Execution schedule but he need to set up the above schedules for studies. Can anybody help me with standard templates regarding the above or route me to a place or site where I can get these templates with links and if we can go to the extreame, resources loaded?!

I need these documents / templates to be in either MSP format or P6 ver 6.2.

Thanks and I hope that somebody will be able to help me.

Replies

Oldest first

No replies yet. Be the first to answer.

Log in or join to reply

ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.

Existing members: your original username and password still work. Forgot password?