Productivity Rates for Heavy Industry [ Petrochemical, Power Plant, Oil & Gas ]
- Created
- 0
- 3
Hello guys, I am currently working on a petrochemical project, and my previous orientation is from High Rise Civil Construction Planning, I was a Commissioning Engineer before in a power plant but I think that will not help me much to plan for a project on a similar nature.
So this comes down to my predicament of having to check the accuracy of the durations that I have on the Schedule which I finalized alongside our construction team, but based on their estimation only, So I was hoping there is a standard or a rule of thumb for this estimation for Man-Hour budgeting for materials and equipments for heavy construction.
Thanks again and may the force be with us.
Regards,
Mil
Replies
Oldest firstNo replies yet. Be the first to answer.
Log in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?