What is a 3D structured schedule?
In the Open Standard
Jean-Yves MoineMember for 17 years 9 months
- Created
- 0
- 2
0
it's simply a classical Gantt wit explicit task name, and strong codification on the three axis of the 3D WBS:
http://3d-wbs.blogspot.fr/2013/03/part-77-what-is-3d-structured-schedule.html
BR, Jean-Yves Moine