Temporary itms in the schedule
In the Open Standard
Ahmet TuterMember for 13 years 8 months
- Created
- 6
- 2
0
What is your practie to show temporary items in the schedule, such as setting or dismantling a crane, or formwork, or scaffolding etc.. I mean these are not part of the main project. So you can not assign them any resource or allocate time to them for proper earned value calculations right? But at the same time they are necessary for the main work to proceed. So do you track those separately or if you insert in the main schedule, how do you deal with this?