Open Planner Studio: free, open-source CPM scheduler that opens .xer and .mpp files

Ethan de WitMember for 0 months
Created
0
247
0

Hi all,

I maintain Open Planner Studio, an open-source (LGPL-3.0) scheduling application for construction, part of the OpenAEC Foundation. It runs in the browser without install or account, and as a desktop app for Windows, macOS and Linux.

I'm looking for planners who want to test it on real schedules.

What may be relevant to you as a planner:

- CPM: total/free/interfering float, FS/SS/FF/SF with lag, eight constraint types, near-critical threshold, multiple float paths, LOE tasks.

- Opens P6 .xer and P6 XML, MS Project .mpp (2010–2021) and MSP XML. Current projects in a multi-project .xer open in separate tabs; cross-project relationships are not used in CPM.

- Calculation profiles for P6 and MS Project conventions, with Retained Logic and Progress Override. P6 Actual Dates is not supported.

- Imported files show the dates as the source program recorded them, and tell you how many tasks a recalculation would move.

- Baselines, progress via an .xlsx/.csv sheet, resource levelling, eleven reports including a DCMA 14-point check.

- Tests include 560 data-driven cases, 13 P6 reference cases and start/finish comparisons with MS Project data from 216 .mpp files.

Not there yet:

- Projects save to IFC 4.3. Export goes to P6 XML or MSP XML; .mpp cannot be written and .xer export is in development.

- P6 XML export omits baselines, activity codes and custom fields, and converts LOE to standard activities.

- .mpp import skips baselines, costs and custom fields.

- No cost management and no 4D model linking yet.

How you can help:

- Test it on a real schedule and tell me where the dates differ from P6 or MS Project, or where your workflow gets stuck. The feedback button in the app works without a GitHub account.

- Send anonymised .xer or .mpp files. Real files help most to improve the import: https://github.com/OpenAEC-Foundation/open-planner-studio/discussions/71

- Request features that would make it usable for your projects, through the feedback button or in GitHub Discussions.

- Contribute code through a pull request.

Browser: https://open-planner-studio.open-aec.com/

Download and source: https://github.com/OpenAEC-Foundation/open-planner-studio

Discussions: https://github.com/OpenAEC-Foundation/open-planner-studio/discussions

Thanks,

Ethan de Wit

Replies

Oldest first

No replies yet. Be the first to answer.

Log in or join to reply

ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.

Existing members: your original username and password still work. Forgot password?

Knowledge

Discussions

Blogs

Norms