Order of Activity Codes
In the Open Standard
Jonathan WardMember for 19 years 8 months
- Created
- 1
- 1
0
Hello,
i have noticed that the Order Column within Activity Codes has a maximum entry count of 254 ( i assume this is because of P3 being a 16 bit program). is there any method of making the Order filed alphnumeric or any other method of forcing the Order Filed to take more than 254 entries?
as always,, many thanks
Jon
i have noticed that the Order Column within Activity Codes has a maximum entry count of 254 ( i assume this is because of P3 being a 16 bit program). is there any method of making the Order filed alphnumeric or any other method of forcing the Order Filed to take more than 254 entries?
as always,, many thanks
Jon