SureTrak - data date line does not fall directly below
In the Open Standard
Ashish AbrahamMember for 19 years 10 months
- Created
- 1
- 1
0
Hi everyone,
I have a question in Primavera SureTrak. I have a SureTrak schedule, and I notice that the Data Date line does not fall directly under Week 1 (ordinal dates). It is located about a day or two later. Is there a way to fix this so that the Data Date line fall directly at the start of Week 1?
Thanks!
I have a question in Primavera SureTrak. I have a SureTrak schedule, and I notice that the Data Date line does not fall directly under Week 1 (ordinal dates). It is located about a day or two later. Is there a way to fix this so that the Data Date line fall directly at the start of Week 1?
Thanks!