Combine 2 Revision is it possible?
In the Open Standard
Pacifico PallasiguiMember for 22 years 8 months
- Created
- 3
- 3
0
Planners
I have one schedule called Revision 1 (with current1 and Target1) and I have another schedule called Revision 2 (with current2 and Target 2. Is it possible to combine this 2 Revision Schedule files into one File and compare by showing summary bars for Revision 1 and 2.
Thank You
Pacifico
I have one schedule called Revision 1 (with current1 and Target1) and I have another schedule called Revision 2 (with current2 and Target 2. Is it possible to combine this 2 Revision Schedule files into one File and compare by showing summary bars for Revision 1 and 2.
Thank You
Pacifico
3 replies
Oldest firstLog in or join to reply