Tunnelling & Mining Production Rates & Build Times:
16 entriesSource page: Tunnelling & Mining
Subjects on this page
| Activity | Entry (verbatim) | Value | Source |
|---|---|---|---|
| Cone Fracture Rock BreakageChemical Excavation Methods | Penetrating Cone Fracture Rock Breakage. Tradename of "SunBurst" from Australia. State of the art, non-explosive chemical rock breakage technology for close proximity excavation applications in mining and civil engineering. Explosive system, cycle time of 6 mins, giving 0.33 m3 each explosion. A typical rate of 10 No cycles per hour, giving 3.3 m3/hr/rig. However, tests have shown differing results... Fresh granite of class 1 strength - One hole in the floor, yielding 0.15 m3 of rock. If more holes had been injected, a yield of 0.5 - 1.0 m3 would be expected. Moderately fresh igneous rock of class 2 strength - Three holes in a sloping trench, in adjacent locations, yielding 2.6 m3 of rock for each hole. Moderately weathered volcanic rock of class 3 strength - Two holes in the floor, in separate locations, yielding 1.2 - 1.5 m3 of rock for each hole. | 3.3 m3 per hrper hrParsed | Cone Fracture Rock Breakage |
| Cut and Cover Tunnels | — | Cut and Cover Tunnels | |
| Design Works | — | Design Works | |
| Drill & Blast Method | — | Drill & Blast Method | |
| Immersed & Sunken Tubes | — | Immersed & Sunken Tubes | |
| In-Situ Tunnel Linings | — | In-Situ Tunnel Linings | |
| Initial Tunnel Supports | — | Initial Tunnel Supports | |
| Micro-Tunneling | — | Micro-Tunneling | |
| New Austrian Tunneling Method | — | New Austrian Tunneling Method | |
| Permanent Bracings | — | Permanent Bracings | |
| Pipe & Box Jacking | — | Pipe & Box Jacking | |
| Shield Tunnelling | — | Shield Tunnelling | |
| Tunnel Boring Machines | — | Tunnel Boring Machines | |
| Tunnel Grouting | — | Tunnel Grouting | |
| Tunnel Leak Repairs | — | Tunnel Leak Repairs | |
| Vertical ShaftsHeadings & Hand Tunneling | Vertical Shafts Vent shaft 10 m dia, build 1 m/day, excavate at 80 m3/day Vent shaft connecting tunnels 6m dia, build 0.75 m/day, excavate at 21 m3/day4 rate statements found; left for an editor | — | Vertical Shafts |
1–16 of 16
These values were contributed by members and reflect the conditions, methods and regions they worked in. They are a starting point for estimating, not a standard. Check them against your own records, the site conditions and the contract before relying on them.