M6.1 Project Controls Strategy & Governance

The learner should be able to design and operate a proportionate project-controls strategy: define what decisions the project needs, identify the information and controls that support them, assign ownership and authority, establish an integrated operating cycle, set escalation rules and verify that the arrangements work in practice. The output is a usable controls plan with clear interfaces, rather than a document that lists every possible technique.
1 knowledge pages1,127 discussionsRead M6.1 in the Open Standard text

Knowledge

Articles and chapters

  • Project Controls Open Standard

    Collaborative work -n-progress contributed by members and experts from across the community cadre.The Project Controls Open Standard brings together practical project controls knowledge in one free,…

    17 Oct 2026
  • M6.5 — Claims & Forensic Analysis

    1. Practical outcomeThe learner should be able to preserve relevant records, define a forensic question, establish a reliable chronology, test cause and effect across schedule and cost, distinguish facts from assumptions and produce reproducible findings. They should understand how project-controls…

    17 Oct 2026
  • M6.4 — Assurance & Control Reviews

    1. Practical outcomeThe learner should be able to plan and conduct a proportionate review of project-controls data, processes and outputs; test evidence against stated criteria; identify material weaknesses; communicate their consequences; and verify corrective action. They should distinguish…

    17 Oct 2026
  • M6.3 — Baseline Change & Configuration Control

    1. Practical outcomeThe learner should be able to turn a bounded approval into a verified revision of the affected scope, schedule, budget, progress, risk and configuration records. They should preserve previous baselines, maintain relationships between approved, forecast and as-built information,…

    17 Oct 2026
  • M6.2 — Change Control

    1. Practical outcomeThe learner should be able to recognise a potential change, record and define it, assess integrated consequences, identify the correct authority, support an approve/reject/defer decision and track implementation to verified closure. They should distinguish a changed requirement…

    17 Oct 2026
  • M6.1 — Project Controls Strategy & Governance

    1. Practical outcomeThe learner should be able to design and operate a proportionate project-controls strategy: define what decisions the project needs, identify the information and controls that support them, assign ownership and authority, establish an integrated operating cycle, set escalation…

    17 Oct 2026
  • M5.5 — Reporting, Insight & Decision Support

    1. Practical outcomeThe learner should be able to turn validated project-control evidence into a clear report that enables a named audience to decide or act. They should select the information appropriate to that authority, explain material exceptions and causes, connect current performance to…

    17 Oct 2026
  • M5.4 — Integrated Forecasting & Predictive Analysis

    1. Practical outcomeThe learner should be able to produce one coherent view of expected project outcomes by reconciling schedule, cost, physical accomplishment, acceptance, commercial exposure and uncertainty. They should identify inconsistent assumptions, distinguish target from forecast, build…

    17 Oct 2026
  • M5.2 — Variance & Trend Analysis

    1. Practical outcomeThe learner should be able to establish a valid comparison, calculate period and cumulative variance, analyse a time series, distinguish delivery deterioration from timing or data effects, find causes across discipline boundaries and test whether an intervention improves the…

    17 Oct 2026
  • M5.1 — Performance Measures & Indicators

    1. Practical outcomeThe learner should be able to turn a project objective and a management decision into a small, coherent set of performance measures. They should define what each measure means, calculate it from controlled evidence, establish an appropriate reference and response threshold,…

    17 Oct 2026

Discussions

1,121 discussions

  1. 2replies
    Capacity Planning Challenges
    Project Management Issues Discussionby Mahendra Gupta· 4 years ago
  2. 10replies
    Are material and equipment costs included in PV, CV, SV?
    Project Management Issues Discussionby Polat Turan· 4 years ago
  3. 4replies
    EVM Queries - What would you do to help?
    Project Management Issues Discussionby Peter Holroyd· 4 years ago
  4. 0replies
    The Origins of Cost Engineering
    Project Management Issues Discussionby Patrick Weaver· 4 years ago
  5. 10replies
    Are GC and contingeency included in EVA?
    Project Management Issues Discussionby Polat Turan· 4 years ago
  6. 4replies
    Covid Delays - what basics to do as Owner, basics to do as contractor?
    Project Management Issues Discussionby John Reeves· 4 years ago
  7. 3replies
    Effective steps to manage large-scale changes in an ongoing project without derailing it
    Project Management Issues Discussionby Mahendra Gupta· 4 years ago
  8. 2replies
    Scheduling Core Papers Updated
    Project Management Issues Discussionby Patrick Weaver· 4 years ago
  9. 1reply
    Davis Bacon Rates - what if multiple county project?
    Project Management Issues Discussionby John Reeves· 4 years ago
  10. 1reply
    Change Order Mark-up on Federal Projects?
    Project Management Issues Discussionby John Reeves· 4 years ago

21–30 of 1,121

Blogs

Thought leadership

  • How Project Planners Should Deal with a Difficult Client PMO

    Ten ways to keep your client happy, protect your construction programme and build stronger working relationships.Every construction planner knows that keeping the client happy matters. But what…

    Sunchana Johnston

    17 Oct 2026
  • PROCEDURES No 16 – Quality Standards

    Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…

    PP Admin

    23 Aug 2026
  • Sunchana’s P6 Lancelot Meets OPC Star Wars

    Several months ago, I was engaged as the planning lead with one of the most significant infrastructure organisations.My assignments appeared straightforward: to provide independent planning expertise and advise senior stakeholders on the most appropriate software solution to support the extensive…

    Sunchana Johnston

    10 Aug 2026

Jobs

Roles asking for this

  1. ManchesterPermanent EmploymentCivil / Building / E&M
    £100-130,000
  2. MacclesfieldPermanent EmploymentCivil / Building / E&M
    £95,000
  3. LondonPermanent Employment
    TBC
  4. LondonPermanent EmploymentCivil / Building / E&M
    £120,000

Norms & Rates

Rates, norms and durations

No norms tagged yet

Rates, norms and durations appear here once entries are linked to this subject.

Resources

Papers, standards and tools

No resources yet

Summaries of papers, standards and tools are added by editors and appear here once published.