Project Controls Open Standard · Module 6 of 6 · M6

Governance & Change

Learning modules M6.1 Project Controls Strategy & Governance; M6.2 Change Control; M6.3 Baseline Change & Configuration Control; M6.4 Assurance & Control Reviews; M6.5 Claims & Forensic Analysis.
5 learning modulesRead M6 in the Open Standard text2,168 discussions43 knowledge pages

Learning modules

In Governance & Change

  1. M6.11,128 items

    Project Controls Strategy & Governance

    The learner should be able to design and operate a proportionate project-controls strategy: define what decisions the project needs, identify the information and controls that support them, assign ownership and authority, establish an integrated operating cycle, set escalation rules and verify that the arrangements work in practice. The output is a usable controls plan with clear interfaces, rather than a document that lists every possible technique.

    Read the text

    1 knowledge1,127 discussions

  2. M6.22 items

    Change Control

    The learner should be able to recognise a potential change, record and define it, assess integrated consequences, identify the correct authority, support an approve/reject/defer decision and track implementation to verified closure. They should distinguish a changed requirement from a forecast movement, corrective action, data correction or contractual claim, and preserve these relationships without treating them as interchangeable.

    Read the text

    1 knowledge1 jobs

  3. M6.31 items

    Baseline Change & Configuration Control

    The learner should be able to turn a bounded approval into a verified revision of the affected scope, schedule, budget, progress, risk and configuration records. They should preserve previous baselines, maintain relationships between approved, forecast and as-built information, reconcile the revised control model and release the correct version to its users.

    Read the text

    1 knowledge

  4. M6.41 items

    Assurance & Control Reviews

    The learner should be able to plan and conduct a proportionate review of project-controls data, processes and outputs; test evidence against stated criteria; identify material weaknesses; communicate their consequences; and verify corrective action. They should distinguish management review, quality checks and independent assurance, and express a conclusion that is bounded by what was actually examined.

    Read the text

    1 knowledge

  5. M6.51,062 items

    Claims & Forensic Analysis

    The learner should be able to preserve relevant records, define a forensic question, establish a reliable chronology, test cause and effect across schedule and cost, distinguish facts from assumptions and produce reproducible findings. They should understand how project-controls evidence supports claims assessment, dispute prevention and learning, while recognising where contractual interpretation, legal advice or specialist delay/cost expertise is required.

    Read the text

    14 knowledge1,048 discussions

Discussions

Latest across the module

  1. 0replies
    Baselines are becoming more than a schedule snapshot
    Project Management Issues Discussionby Philip Day· 2 weeks ago
  2. 0replies
    Cost Control
    Planning & Project Controls Accreditationby Aspar Aswin· 2 months ago
  3. 0replies
    Schedule Certificate
    Project Management Issues Discussionby Aspar Aswin· 2 months ago
  4. 0replies
    Daily Construction Report
    Project Management Issues Discussionby Joshua Leonardo· 3 months ago
  5. 5replies
    Is the delay excusable?
    Forensic Claims Analysisby Gold Group· 10 months ago
  6. 8replies
    FIDIC SILVER BOOK
    Forensic Claims Analysisby Rosalind Ng· 1 year ago
  7. 1reply
    PC Expo – A Busy Week
    Forensic Claims Analysisby Patrick Weaver· 1 year ago
  8. 0replies
    Basic Principles of Delay Analysis
    Forensic Claims Analysisby Mike Testro· 1 year ago

Knowledge

Recently updated

  • Project Controls Open Standard

    Collaborative work -n-progress contributed by members and experts from across the community cadre.The Project Controls Open Standard brings together practical project controls knowledge in one free,…

    17 Oct 2026
  • M6.5 — Claims & Forensic Analysis

    1. Practical outcomeThe learner should be able to preserve relevant records, define a forensic question, establish a reliable chronology, test cause and effect across schedule and cost, distinguish facts from assumptions and produce reproducible findings. They should understand how project-controls…

    17 Oct 2026
  • M6.4 — Assurance & Control Reviews

    1. Practical outcomeThe learner should be able to plan and conduct a proportionate review of project-controls data, processes and outputs; test evidence against stated criteria; identify material weaknesses; communicate their consequences; and verify corrective action. They should distinguish…

    17 Oct 2026
  • M6.3 — Baseline Change & Configuration Control

    1. Practical outcomeThe learner should be able to turn a bounded approval into a verified revision of the affected scope, schedule, budget, progress, risk and configuration records. They should preserve previous baselines, maintain relationships between approved, forecast and as-built information,…

    17 Oct 2026
  • M6.2 — Change Control

    1. Practical outcomeThe learner should be able to recognise a potential change, record and define it, assess integrated consequences, identify the correct authority, support an approve/reject/defer decision and track implementation to verified closure. They should distinguish a changed requirement…

    17 Oct 2026
  • M6.1 — Project Controls Strategy & Governance

    1. Practical outcomeThe learner should be able to design and operate a proportionate project-controls strategy: define what decisions the project needs, identify the information and controls that support them, assign ownership and authority, establish an integrated operating cycle, set escalation…

    17 Oct 2026
  • M5.5 — Reporting, Insight & Decision Support

    1. Practical outcomeThe learner should be able to turn validated project-control evidence into a clear report that enables a named audience to decide or act. They should select the information appropriate to that authority, explain material exceptions and causes, connect current performance to…

    17 Oct 2026
  • M5.4 — Integrated Forecasting & Predictive Analysis

    1. Practical outcomeThe learner should be able to produce one coherent view of expected project outcomes by reconciling schedule, cost, physical accomplishment, acceptance, commercial exposure and uncertainty. They should identify inconsistent assumptions, distinguish target from forecast, build…

    17 Oct 2026