Is there is nay site where i can get the example for a big project

Kumar BaijuMember for 15 years 8 months
Created
2
2
0

Hi all

   any one can tell me the site where i can get the example of a big project with resource, cost etc. Or where can i save a project so that it will helps for the new comer to see the activity relation.

 

Regards\\

KBJ

2 replies

Oldest first
  1. 0
    Mike Testro ·

    Hi Kumar There have been many

    Hi Kumar

    There have been many such requests posted on PP over the years with very little response.

    The main reason is that most construction programmes are confidential to the company and will not be released to a third party.

    The other reasons are that every project is unique and the is no statnadrd template that will fit any project and you really must plan your own job out of your own experience.

    If you can't build it you can't plan it.

    Best regards

    Mike Testro

  2. 0
    Kumar Baiju ·

    Thanks Mike       Is this WBS

    Thanks Mike

          Is this WBS structure is right for power plant engineering.

        

    WBS Code WBS Name
    POWER 2 X 525 MW  THERMAL POWER PLANT
      POWER.1 General
        POWER.1.8 Power Technology
        POWER.1.1 Civil
        POWER.1.2 Structure
        POWER.1.9 General Civil Layout & Transportation ( CLT )
        POWER.1.3 Mechanical
        POWER.1.4 Electrical
        POWER.1.5 Instrumentation
        POWER.1.8 MH
        POWER.1.6 FS & PD
        POWER.1.7 HVAC
      POWER.2 Basic Engineering
        POWER.2.3 Assignments
        POWER.2.1 Technical Specification
      POWER.3 Procurement Assistance
        POWER.3.1 Receipt of Bids
        POWER.3.2 Tender Evaluation
        POWER.3.3 Vendor Drawing Approval
      POWER.4 Detail Engineering
        POWER.4.2 Power Technology
        POWER.4.3 Civil
        POWER.4.4 Structure
        POWER.4.12 General Civil Layout & Transportation ( CLT )
        POWER.4.8 Mechanical
        POWER.4.9 Electrical
        POWER.4.10 Instrumentation
        POWER.4.7 MH
        POWER.4.5 FSPD
        POWER.4.6 HVAC
        POWER.4.11 Sheeting

       

Log in or join to reply