Using P3 created layouts and filters with Suretrak
In the Open Standard
Bruno St-GelaisMember for 25 years 2 months
- Created
- 1
- 1
0
Hi everybody
I have a project schedule created and maintained in Primavera P3 on PC #1 at location 1.
I regularly haved to use my schedule on location 2 with PC #2 which only has a Suretrak license. When I open my project with Suretrak, I cannot access my layouts and filters.
Is there any way to solve this problem.
I have a project schedule created and maintained in Primavera P3 on PC #1 at location 1.
I regularly haved to use my schedule on location 2 with PC #2 which only has a Suretrak license. When I open my project with Suretrak, I cannot access my layouts and filters.
Is there any way to solve this problem.
1 reply
Oldest firstLog in or join to reply