Budgeted cost does not match with generated cash flow
In the Open Standard
Albert BalogoMember for 18 years 4 months
- Created
- 3
- 4
0
Hi to All,
!. Any body can help me, using P3 version 3.1 I’ve loaded the budgeted cost (Selling cost of project) for each activity, but the problem is, when i trying to run for monthly cashflow the generated output could not match to the budgeted cost it’s exceeding almost 10% of total budgeted cost.
2.(Budgeted cost)-(Cost to date) = Cost to complete..... these three was loaded to my program but the amount of cost to complete has wrong output most of the activity.
Thank you
Albert
!. Any body can help me, using P3 version 3.1 I’ve loaded the budgeted cost (Selling cost of project) for each activity, but the problem is, when i trying to run for monthly cashflow the generated output could not match to the budgeted cost it’s exceeding almost 10% of total budgeted cost.
2.(Budgeted cost)-(Cost to date) = Cost to complete..... these three was loaded to my program but the amount of cost to complete has wrong output most of the activity.
Thank you
Albert
3 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?