Budgeted Quantity (with Different Cost Category)
In the Open Standard
Jun GallardoMember for 18 years 6 months
- Created
- 6
- 5
0
Hello everyone.
I made a schedule that is resource loaded. My resources include Material and Manpower. Cost Categories are assigned with Material as M and Manpower as L. Normally, adding a new column for BUDGETED QUANTITY in the layout sum up both the quantities of the Material and Manpower resources. My problem is how to add a new column separating both the quantity of the material and that of the labor. I know this is possible in the tabular reports but I want it to be presented in the layout.
Regards.
JUN
I made a schedule that is resource loaded. My resources include Material and Manpower. Cost Categories are assigned with Material as M and Manpower as L. Normally, adding a new column for BUDGETED QUANTITY in the layout sum up both the quantities of the Material and Manpower resources. My problem is how to add a new column separating both the quantity of the material and that of the labor. I know this is possible in the tabular reports but I want it to be presented in the layout.
Regards.
JUN
6 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?