Planning & Project Control Manual
- Created
- 88
- 22
HI Guys,
NEED SOME HELP in developing a PLANNING & PROJECT CONTROL MANUAL. Existing manual with the company is old now and need to refine to suit the competing demands with availability of new softwares and project management standards.
I made d framework, covering following points
1. Introduction Covering roles and responsibilities and KPI’S
2. WBS development, dictionary, integration with orgz structure, responsibility assignment matrix integrated with WBS
3. Schedule Management Plan: How to develop a Schedule in P3/P5/P6. What r d things to be considered while submitting and approving the schedule. More or less a SCHEDULE MANAGEMENT SYSTEM.
4. Cost Management Plan: Cost Management System, Cost Funding, Cost Estimating and Approval of Monthly bills against cost loaded in program
5. Performance Measurement Baselines: Integrated Performance Measurement Baselines with respect to cost and schedule. Development of S-Curves and monitoring & Controlling aspects. To include weightage factors etc.
6. Work Authorization System:
7. Progress Status: Daily/Weekly and Monthly Report Curves including collection of project data and interface with PM and CM.
8. Variance Management & Project Reports
9. Integrated Change Control System
If I had missed out any of the points or if somebody wud like to elaborate the points mentioned above, it wud b highly appreciated.
I shall be obliged, if somebody can share their manual with me, for making systems herein more stronger.
Waiting for reply
Cheers,
Raviraj
88 replies
Oldest firstLog in or join to reply
ProjectControls.com is free to join. Members can post questions, reply, vote and follow discussions.
Existing members: your original username and password still work. Forgot password?