Rates, Norms & Durations / Building & Construction / Earthworks & Excavation
Basement Excavations
2 entriesSource page: Basement Excavations
Subjects on this page
| Activity | Entry (verbatim) | Source |
|---|---|---|
| Basement Excavation | Basement ExcavationTask / DescriptionSlow Ave Fast Units Hydraulic Excavator, 0.3m3 bucket, Sand/Soil - Basement Works6.4 8.0 9.4 m3/hr Hydraulic Excavator, 0.3m3 bucket, Gravel Beds - Basement Works5.5 6.9 8.1 m3/hr Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk - Basement Works5.2 6.5 7.9 m3/hr Hydraulic Excavator, 0.3m3 bucket, Hard Ground - Basement Works4.7 5.9 8.2 m3/hr Hydraulic Excavator, 0.4m3 bucket, Sand/Soil - Basement Works12.6 15.4 18.9 m3/hr Hydraulic Excavator, 0.4m3 bucket, Gravel Beds - Basement Works11.7 14.3 16.7 m3/hr Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk - Basement Works10.9 13.3 15.6 m3/hr Hydraulic Excavator, 0.4m3 bucket, Hard Ground - Basement Works9.7 11.8 14.0 m3/hr Hydraulic Excavator, 0.5m3 bucket, Sand/Soil - Basement Works18.2 20.0 23.0 m3/hr Hydraulic Excavator, 0.5m3 bucket, Gravel Beds - Basement Works16.5 18.1 20.0 m3/hr Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk - Basement Works15.4 16.7 19.3 m3/hr Hydraulic Excavator, 0.5m3 bucket, Hard Ground - Basement Works13.3 15.4 17.7 m3/hr12 rate statements found; left for an editor | Basement Excavation |
| Excavate and Remove | Excavate and RemoveTask / DescriptionSlow Ave Fast Units Excavate Spoil Heaps to Transport, 0.6m3 bucket, Sand/Soil14.5 20.0 25.6 m3/hr Excavate Spoil Heaps to Transport, 0.6m3 bucket, Gravel Beds15.2 20.4 25.6 m3/hr Excavate Spoil Heaps to Transport, 0.6m3 bucket, Clay/Chalk12.3 18.5 23.2 m3/hr Excavate Spoil Heaps to Transport, 0.6m3 bucket, Boulder Clay11.2 16.9 21.3 m3/hr Excavate Spoil Heaps to Transport, 1.1m3 bucket, Sand/Soil25.4 30.3 35.7 m3/hr Excavate Spoil Heaps to Transport, 1.1m3 bucket, Gravel Beds25.6 31.3 37.0 m3/hr Excavate Spoil Heaps to Transport, 1.1m3 bucket, Clay/Chalk22.5 27.8 33.3 m3/hr Excavate Spoil Heaps to Transport, 1.1m3 bucket, Boulder Clay18.9 24.4 30.3 m3/hr Load Spoil to Barge, capacity 2,000m3- 8.0 - hrs Load Spoil to Barge, capacity 1,500m3- 6.5 - hrs Load Spoil to Barge, capacity 1,000m3- 5.5 - hrs Spoil conveyor, 600mm belt, 150m/min- 260.0 - m3/hr8 rate statements found; left for an editor | Excavate and Remove |
1–2 of 2
These values were contributed by members and reflect the conditions, methods and regions they worked in. They are a starting point for estimating, not a standard. Check them against your own records, the site conditions and the contract before relying on them.