Skip to content

Open Standard · M2 Planning & Scheduling

M2.2 Logic, Critical Path & Float

The learner should be able to construct and analyse a logically linked schedule, choose relationships, recognise missing or inappropriate logic, distinguish logic from constraints, identify critical and near-critical paths, understand total and free float, recognise negative or unusually high float, understand how progress changes the path, and use the analysis to support decisions. The goal is to understand the schedule as a model, not simply as software output.
8 knowledge pages4,159 discussions1 blogsRead M2.2 in the Open Standard text

Knowledge

Articles and chapters

  • M6.5 — Claims & Forensic Analysis

    By the end of this section, the practitioner should be able to preserve relevant records, define a forensic question, establish a reliable chronology, test cause and effect across schedule and cost, distinguish facts from assumptions and produce reproducible findings. They should understand how project-controls…

    22 Oct 2026
  • M6.4 — Assurance & Control Reviews

    By the end of this section, the practitioner should be able to plan and conduct a proportionate review of project-controls data, processes and outputs; test evidence against stated criteria; identify material weaknesses; communicate their consequences; and verify corrective action. They should distinguish…

    22 Oct 2026
  • M6.3 — Baseline Change & Configuration Control

    By the end of this section, the practitioner should be able to turn a bounded approval into a verified revision of the affected scope, schedule, budget, progress, risk and configuration records. They should preserve previous baselines, maintain relationships between approved, forecast and as-built information,…

    22 Oct 2026
  • M5.1 — Performance Measures & Indicators

    By the end of this section, the practitioner should be able to turn a project objective and a management decision into a small, coherent set of performance measures. They should define what each measure means, calculate it from controlled evidence, establish an appropriate reference and response threshold,…

    22 Oct 2026
  • M4.4 — Risk Response & Control

    By the end of this section, the practitioner should be able to turn an analysed threat or opportunity into a controlled management response that is proportionate, owned, time-bound and integrated with the way the project is actually delivered.

    22 Oct 2026
  • M4.3 — Quantitative Risk Analysis

    By the end of this section, the practitioner should be able to take a defined project objective, a credible current schedule or cost model, and a selected set of material uncertainties and turn them into a transparent quantitative view of possible outcomes.

    22 Oct 2026
  • M4.2 — Qualitative Risk Analysis

    By the end of this section, the practitioner should be able to take identified risks and assess them systematically so that management attention focuses on what matters. They should be able to assess probability and impact, apply a scoring framework, use a matrix appropriately, consider other relevant factors,…

    22 Oct 2026
  • M4.1 — Risk Identification & Assessment

    By the end of this section, the learner should be able to establish a disciplined risk-identification process that finds, frames and records uncertainty before it is scored or modelled. They should be able to distinguish risks from issues, assumptions, dependencies, decisions and actions.

    22 Oct 2026
  • M2.5 — Schedule Forecasting & Analysis

    By the end of this section, the learner should be able to take a credible current schedule and use it to forecast likely future outcomes, explain what is driving those outcomes, test alternative scenarios, assess the effect of uncertainty and management interventions.

    21 Oct 2026
  • M2.4 — Progress Updating & Schedule Control

    1. Practical outcomeBy the end of this section, the learner should be able to take an approved schedule and turn it into a trustworthy current control model at each reporting cycle. They should be able to establish a clear data date, collect and validate actual progress, record actual starts and acomplishments.

    21 Oct 2026

Discussions

4,156 discussions

  1. 0replies
    Collaborative Planning
    Planning, Scheduling & Programming Discussionby Andy Beckett· 8 years ago
  2. 0replies
    Looking for a offshore wind planner in Boston region
    Planning, Scheduling & Programming Discussionby Floris Prager· 8 years ago
  3. 0replies
    Simple planning level-0 connected to Outlook
    Planning, Scheduling & Programming Discussionby Lorenzo Cecchini· 8 years ago
  4. 0replies
    P6 SQL Express Server - Remote Connection Setup
    Planning, Scheduling & Programming Discussionby Jacques Meheut· 8 years ago
  5. 0replies
    Piping activities
    Planning, Scheduling & Programming Discussionby Muhammad Ahmad· 8 years ago
  6. 0replies
    The Origins of Schedule Management
    Planning, Scheduling & Programming Discussionby Patrick Weaver· 8 years ago
  7. 0replies
    Sample Schedule Required for Design & Construction of Chemical Lab, HVAC, & New Building in a Refinery
    Planning, Scheduling & Programming Discussionby Raja Pandian· 8 years ago
  8. 0replies
    Cost loading problem
    Planning, Scheduling & Programming Discussionby Ahmed Sho· 8 years ago
  9. 0replies
    P6 - Baseline Dates Broken
    Planning, Scheduling & Programming Discussionby Kyle Dundas· 8 years ago
  10. 0replies
    A survey on Impact of construction programme and cash flow tecniques
    Planning, Scheduling & Programming Discussionby Chux Madubata· 8 years ago

3,331–3,340 of 4,156

Blogs

Thought leadership

  • How Project Planners Should Deal with a Difficult Client PMO

    Ten ways to keep your client happy, protect your construction programme and build stronger working relationships.Every construction planner knows that keeping the client happy matters. But what…

    Sunchana Johnston

    17 Oct 2026
  • Sunchana’s P6 Lancelot Meets OPC Star Wars

    Several months ago, I was engaged as the planning lead with one of the most significant infrastructure organisations.My assignments appeared straightforward: to provide independent planning expertise and advise senior stakeholders on the most appropriate software solution to support the extensive…

    Sunchana Johnston

    10 Aug 2026
  • PROCEDURES No 15 – Planning Standards

    Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…

    PP Admin

    10 Aug 2026
  • PROCEDURES No 14 – Minimum Planning Expectations from THE MANAGEMENT!

    Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…

    PP Admin

    20 Jul 2026
  • Programme Planning Standards: The Rules of the Game

    Programme Planning Standards: The Rules of the GameStudies consistently show that organisations with mature project management practices achieve better delivery outcomes than those with ad hoc approaches. Yet one of the simplest disciplines is often overlooked—agreeing a common Programme Planning…

    Sunchana Johnston

    5 Jul 2026
  • Projects…Start with What & Why

    What are we doing? And why are we doing it? These are the first two critical questions that must be asked at the start of every project. However, they often go unanswered!The nominal “what” is often provided. Implement a new system. Launch a new program. Build a road or bridge. However, the “why” is

    Alan Zucker

    7 Jul 2025

Jobs

Roles asking for this

  1. Planning Planet LondonPermanent Employment
    TBC
  2. London (EU.UK.LON)Permanent EmploymentCivil / Building / E&M
    £85,000 + car or allowance (circa £6,500) + excellent staff benefits
  3. ManchesterPermanent EmploymentCivil / Building / E&M
    £100-130,000
  4. MacclesfieldPermanent EmploymentCivil / Building / E&M
    £95,000
  5. LondonPermanent Employment
    TBC

Norms & Rates

Rates, norms and durations

No norms tagged yet

Rates, norms and durations appear here once entries are linked to this subject.

Resources

Papers, standards and tools

No resources yet

Summaries of papers, standards and tools are added by editors and appear here once published.