Open Standard · M2 Planning & Scheduling
Schedule development
Knowledge
Articles and chapters
- M2.5 — Schedule Forecasting & Analysis21 Oct 2026
By the end of this section, the learner should be able to take a credible current schedule and use it to forecast likely future outcomes, explain what is driving those outcomes, test alternative scenarios, assess the effect of uncertainty and management interventions.
- M2.4 — Progress Updating & Schedule Control21 Oct 2026
1. Practical outcomeBy the end of this section, the learner should be able to take an approved schedule and turn it into a trustworthy current control model at each reporting cycle. They should be able to establish a clear data date, collect and validate actual progress, record actual starts and acomplishments.
- M2.3 — Resources, Productivity & Schedule Optimisation21 Oct 2026
By the end of this section, the learner should be able to test whether a logically valid schedule is actually deliverable with the people, skills, equipment, facilities and other constrained resources available to the project. They should be able to distinguish resource demand from capacity.
- M2.2 — Logic, Critical Path & Float21 Oct 2026
The learner should be able to construct and analyse a logically linked schedule, choose relationships, recognise missing or inappropriate logic, distinguish logic from constraints, identify critical and near-critical paths, understand total and free float, recognise negative or unusually high float.
- M1.2 — Coding & Control Structures21 Oct 2026
By the end of this section, the practitioner should be able to design and apply a coherent set of coding and control structures that allows project information to be organised, integrated, aggregated, reconciled and reported without repeatedly rebuilding the underlying data.
- M1.3 — Integrated Baselines21 Oct 2026
By the end of this section, the practitioner should be able to establish, test and explain an integrated project baseline that brings authorised scope, schedule, budget, assumptions, progress rules and accountability into one coherent reference position.
- M1.5 — Data Quality, Integration & Traceability21 Oct 2026
By the end of this section, the learner should be able to establish and operate a project-controls data environment in which important information is complete enough, accurate enough, timely enough, consistent enough and traceable enough to support management decisions.
- M2.1 — Planning & Schedule Development21 Oct 2026
By the end of this section, the learner should be able to turn authorised scope and an agreed delivery strategy into a credible, structured and maintainable project schedule that explains what work must be performed, in what broad sequence, and over what durations and calendars etc.
- M1.1 — Scope & Work Breakdown Structures21 Oct 2026
By the end of this section, the practitioner should be able to take an authorised project scope and turn it into a Work Breakdown Structure.
- M1.4 — Progress Measurement21 Oct 2026
By the end of this section, the learner should be able to design, apply and challenge progress-measurement rules that convert evidence of completed work into a credible statement of physical accomplishment. They should be able to choose an appropriate measurement method.
Discussions
4,588 discussions
- 4repliesSubcontractor's Schedule Imported but no Actual EarningsPlanning, Scheduling & Programming Discussionby Brandon Wall· 11 years ago
- 12repliesUsing Two SchedulesPlanning, Scheduling & Programming Discussionby Aaron Melton· 11 years ago
- 8repliesI saw an advertisement for a cool 1 page multi proj Summary Gantt Software Program - now I can't find it...Planning, Scheduling & Programming Discussionby John Reeves· 11 years ago
- 11repliesCritical mass vs criticial pathShutdowns / Turnarounds / Outages (STOs)by Floris Gering· 11 years ago
- 0repliesNew Website with PM Blogs and Exercises in Critical Path Drag and Drag CostPlanning, Scheduling & Programming Discussionby Stephen Devaux· 11 years ago
- 2repliesUnable to attach CV in the application fomatPlanning, Scheduling & Programming Discussionby Gilbert Liu· 11 years ago
- 2repliesBest Way to Export & Review Resources in PDF & ExcelPlanning, Scheduling & Programming Discussionby Wullie Hendry· 11 years ago
- 6repliesreschedule and Problem with Previouse base linePlanning, Scheduling & Programming Discussionby Ali Haghjou· 11 years ago
- 0repliesUse The WBS Dictionary To Better Understand Your SchedulePlanning, Scheduling & Programming Discussionby Emily Foster· 12 years ago
- 13repliesBaseline submission to ClientPlanning, Scheduling & Programming Discussionby Kannan CP· 12 years ago
1,281–1,290 of 4,588
Blogs
Thought leadership
- How Project Planners Should Deal with a Difficult Client PMO17 Oct 2026
Ten ways to keep your client happy, protect your construction programme and build stronger working relationships.Every construction planner knows that keeping the client happy matters. But what…
Sunchana Johnston
- PROCEDURES No 16 – Quality Standards23 Aug 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- Sunchana’s P6 Lancelot Meets OPC Star Wars10 Aug 2026
Several months ago, I was engaged as the planning lead with one of the most significant infrastructure organisations.My assignments appeared straightforward: to provide independent planning expertise and advise senior stakeholders on the most appropriate software solution to support the extensive…
Sunchana Johnston
- PROCEDURES No 15 – Planning Standards10 Aug 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- PROCEDURES No 14 – Minimum Planning Expectations from THE MANAGEMENT!20 Jul 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- Programme Planning Standards: The Rules of the Game5 Jul 2026
Programme Planning Standards: The Rules of the GameStudies consistently show that organisations with mature project management practices achieve better delivery outcomes than those with ad hoc approaches. Yet one of the simplest disciplines is often overlooked—agreeing a common Programme Planning…
Sunchana Johnston
Jobs
Roles asking for this
- ManchesterPermanent EmploymentCivil / Building / E&M£100-130,000
- MacclesfieldPermanent EmploymentCivil / Building / E&M£95,000
- LondonPermanent EmploymentTBC
- LondonPermanent EmploymentCivil / Building / E&M£120,000
Norms & Rates
Rates, norms and durations
| Activity | Entry (verbatim) | Section | Source |
|---|---|---|---|
| 005 Initiate Phase | IT Engineering Projects | 005 Initiate Phase | |
| 010 Analyse Phase | IT Engineering Projects | 010 Analyse Phase | |
| 015 Design Phase | IT Engineering Projects | 015 Design Phase | |
| 020 Develop Phase | IT Engineering Projects | 020 Develop Phase | |
| 025 Test Phase | IT Engineering Projects | 025 Test Phase | |
| 030 Implement Phase | IT Engineering Projects | 030 Implement Phase | |
| 035 Support Phase | IT Engineering Projects | 035 Support Phase | |
| Aluminium Roofing | Aluminium Roofing Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Flat Roof Aluminium Work = 2.8 m2/day Sloping Roof Aluminium Work = 1.9 m2/day | Metal Roof Decking | Aluminium Roofing |