Schedule development
Knowledge
Articles and chapters
- M3.5 — Cost Forecasting & Commercial/Contract Interfaces21 Oct 2026
By the end of this section, the learner should be able to produce and challenge a credible cost forecast that explains what the project or package is now expected to cost, why that expectation differs from the authorised baseline or prior forecast, what commercial and delivery assumptions affect outcomes.
- M3.2 — Budgeting & Cost Baselines21 Oct 2026
By the end of this section, the learner should be able to turn an approved estimate and authorised project scope into a controlled cost budget and time-phased cost baseline that can be used to plan, measure and govern project cost performance.
- M3.1 — Cost Estimating & Basis of Estimate21 Oct 2026
By the end of this section, the practitioner should be able to turn authorised scope and available project information into a traceable cost estimate whose quantities, rates, productivity assumptions, methods, exclusions and uncertainty can be understood, challenged and reproduced.
- M2.5 — Schedule Forecasting & Analysis21 Oct 2026
By the end of this section, the learner should be able to take a credible current schedule and use it to forecast likely future outcomes, explain what is driving those outcomes, test alternative scenarios, assess the effect of uncertainty and management interventions.
- M2.4 — Progress Updating & Schedule Control21 Oct 2026
1. Practical outcomeBy the end of this section, the learner should be able to take an approved schedule and turn it into a trustworthy current control model at each reporting cycle. They should be able to establish a clear data date, collect and validate actual progress, record actual starts and acomplishments.
- M2.3 — Resources, Productivity & Schedule Optimisation21 Oct 2026
By the end of this section, the learner should be able to test whether a logically valid schedule is actually deliverable with the people, skills, equipment, facilities and other constrained resources available to the project. They should be able to distinguish resource demand from capacity.
- M2.2 — Logic, Critical Path & Float21 Oct 2026
The learner should be able to construct and analyse a logically linked schedule, choose relationships, recognise missing or inappropriate logic, distinguish logic from constraints, identify critical and near-critical paths, understand total and free float, recognise negative or unusually high float.
- M2.1 — Planning & Schedule Development21 Oct 2026
By the end of this section, the learner should be able to turn authorised scope and an agreed delivery strategy into a credible, structured and maintainable project schedule that explains what work must be performed, in what broad sequence, and over what durations and calendars etc.
- M1.5 — Data Quality, Integration & Traceability21 Oct 2026
By the end of this section, the learner should be able to establish and operate a project-controls data environment in which important information is complete enough, accurate enough, timely enough, consistent enough and traceable enough to support management decisions.
- M1.4 — Progress Measurement21 Oct 2026
By the end of this section, the learner should be able to design, apply and challenge progress-measurement rules that convert evidence of completed work into a credible statement of physical accomplishment. They should be able to choose an appropriate measurement method.
Discussions
4,588 discussions
- 1replyShift resourcesPlanning, Scheduling & Programming Discussionby Wilson Reyes· 12 years ago
- 5repliesAdtivity Duration and resource levellingPlanning, Scheduling & Programming Discussionby Nikan G· 12 years ago
- 1replyUnassigned baseline problem with current projectPlanning, Scheduling & Programming Discussionby Müjdat Özacar· 12 years ago
- 0repliesLocal/Govt Regulation requirements(work permits) for MalaysiaPlanning, Scheduling & Programming Discussionby Kumar S· 12 years ago
- 4repliesNew Schedule LibraryPlanning, Scheduling & Programming Discussionby Aaron Melton· 12 years ago
- 1replyMS project deadline equivalent in P6 bar chartPlanning, Scheduling & Programming Discussionby G T· 12 years ago
- 0repliesHow to clear activities filter?Planning, Scheduling & Programming Discussionby Xenia Marami· 12 years ago
- 2repliesSample WBS for RailwayPlanning, Scheduling & Programming Discussionby Leonard Mon· 12 years ago
- 0repliesI just completed and submitted Managing Projects as Investments: Earned Value to Business ValuePlanning, Scheduling & Programming Discussionby Stephen Devaux· 12 years ago
- 2repliesUpdate OPtionsPlanning, Scheduling & Programming Discussionby Osama Haggag· 12 years ago
1,461–1,470 of 4,588
Blogs
Thought leadership
- How Project Planners Should Deal with a Difficult Client PMO17 Oct 2026
Ten ways to keep your client happy, protect your construction programme and build stronger working relationships.Every construction planner knows that keeping the client happy matters. But what…
Sunchana Johnston
- PROCEDURES No 16 – Quality Standards23 Aug 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- Sunchana’s P6 Lancelot Meets OPC Star Wars10 Aug 2026
Several months ago, I was engaged as the planning lead with one of the most significant infrastructure organisations.My assignments appeared straightforward: to provide independent planning expertise and advise senior stakeholders on the most appropriate software solution to support the extensive…
Sunchana Johnston
- PROCEDURES No 15 – Planning Standards10 Aug 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- PROCEDURES No 14 – Minimum Planning Expectations from THE MANAGEMENT!20 Jul 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- Programme Planning Standards: The Rules of the Game5 Jul 2026
Programme Planning Standards: The Rules of the GameStudies consistently show that organisations with mature project management practices achieve better delivery outcomes than those with ad hoc approaches. Yet one of the simplest disciplines is often overlooked—agreeing a common Programme Planning…
Sunchana Johnston
Jobs
Roles asking for this
- ManchesterPermanent EmploymentCivil / Building / E&M£100-130,000
- MacclesfieldPermanent EmploymentCivil / Building / E&M£95,000
- LondonPermanent EmploymentTBC
- LondonPermanent EmploymentCivil / Building / E&M£120,000
Norms & Rates
Rates, norms and durations
| Activity | Entry (verbatim) | Section | Source |
|---|---|---|---|
| 005 Initiate Phase | IT Engineering Projects | 005 Initiate Phase | |
| 010 Analyse Phase | IT Engineering Projects | 010 Analyse Phase | |
| 015 Design Phase | IT Engineering Projects | 015 Design Phase | |
| 020 Develop Phase | IT Engineering Projects | 020 Develop Phase | |
| 025 Test Phase | IT Engineering Projects | 025 Test Phase | |
| 030 Implement Phase | IT Engineering Projects | 030 Implement Phase | |
| 035 Support Phase | IT Engineering Projects | 035 Support Phase | |
| Aluminium Roofing | Aluminium Roofing Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Flat Roof Aluminium Work = 2.8 m2/day Sloping Roof Aluminium Work = 1.9 m2/day | Metal Roof Decking | Aluminium Roofing |