Skip to content

Open Standard · M2 Planning & Scheduling

Schedule development

370 knowledge pages4,593 discussions9 blogs4 jobs202 normsAlso: schedule, programme, program, scheduling, planning, activity durations

Knowledge

Articles and chapters

  • M1.1 — Scope & Work Breakdown Structures

    By the end of this section, the practitioner should be able to take an authorised project scope and turn it into a Work Breakdown Structure.

    21 Oct 2026
  • M1.2 — Coding & Control Structures

    By the end of this section, the practitioner should be able to design and apply a coherent set of coding and control structures that allows project information to be organised, integrated, aggregated, reconciled and reported without repeatedly rebuilding the underlying data.

    21 Oct 2026
  • M1.3 — Integrated Baselines

    By the end of this section, the practitioner should be able to establish, test and explain an integrated project baseline that brings authorised scope, schedule, budget, assumptions, progress rules and accountability into one coherent reference position.

    21 Oct 2026
  • M6.5 — Claims & Forensic Analysis

    1. Practical outcome The learner should be able to preserve relevant records, define a forensic question, establish a reliable chronology, test cause and effect across schedule and cost, distinguish facts from assumptions and produce reproducible findings. They should understand how project-controls…

    20 Oct 2026
  • Project Controls Open Standard

    Collaborative work -n-progress contributed by members and experts from across the community cadre.The Project Controls Open Standard brings together practical project controls knowledge in one free,…

    17 Oct 2026
  • M6.3 — Baseline Change & Configuration Control

    1. Practical outcomeThe learner should be able to turn a bounded approval into a verified revision of the affected scope, schedule, budget, progress, risk and configuration records. They should preserve previous baselines, maintain relationships between approved, forecast and as-built information,…

    17 Oct 2026
  • M6.2 — Change Control

    1. Practical outcomeThe learner should be able to recognise a potential change, record and define it, assess integrated consequences, identify the correct authority, support an approve/reject/defer decision and track implementation to verified closure. They should distinguish a changed requirement…

    17 Oct 2026
  • M6.1 — Project Controls Strategy & Governance

    1. Practical outcomeThe learner should be able to design and operate a proportionate project-controls strategy: define what decisions the project needs, identify the information and controls that support them, assign ownership and authority, establish an integrated operating cycle, set escalation…

    17 Oct 2026
  • M5.4 — Integrated Forecasting & Predictive Analysis

    1. Practical outcomeThe learner should be able to produce one coherent view of expected project outcomes by reconciling schedule, cost, physical accomplishment, acceptance, commercial exposure and uncertainty. They should identify inconsistent assumptions, distinguish target from forecast, build…

    17 Oct 2026
  • M5.3 — Integrated Cost & Schedule Performance

    1. Practical outcomeThe learner should be able to connect authorised scope, time-phased budget, evidence of accomplishment and incurred cost at a common cut-off. They should calculate and interpret basic Earned Value Management measures, reconcile them to source records, distinguish cost efficiency…

    17 Oct 2026

Discussions

4,588 discussions

  1. 6replies
    Loading Schedule with Maanhours
    Planning, Scheduling & Programming Discussionby Sm Pum· 13 years ago
  2. 6replies
    UPDATING THE PROJECT
    Planning, Scheduling & Programming Discussionby Dura Cell· 13 years ago
  3. 6replies
    Procedure Of Re-bar fixing
    Planning, Scheduling & Programming Discussionby Jim Tse· 14 years ago
  4. 6replies
    How to propotionate Man power / trade
    Planning, Scheduling & Programming Discussionby Saju TS· 14 years ago
  5. 6replies
    Project Scheduling Rules, a free ebook
    Planning, Scheduling & Programming Discussionby Nader K. Rad· 14 years ago
  6. 6replies
    sewerage and drainage project
    Planning, Scheduling & Programming Discussionby Sunil Babu· 14 years ago
  7. 6replies
    Narrative document on basis of scheduling
    Planning, Scheduling & Programming Discussionby Radhakrishnan Nair· 14 years ago
  8. 6replies
    Progression as a Project Planner
    Planning & Programming Trainingby David Craig· 14 years ago
  9. 6replies
    Schedule Levels
    Planning, Scheduling & Programming Discussionby Sally Ryan· 14 years ago
  10. 6replies
    Filtering For Activities only progessd or completed that reporting perion
    Planning, Scheduling & Programming Discussionby Keith Elliott· 14 years ago

1,001–1,010 of 4,588

Blogs

Thought leadership

  • How Project Planners Should Deal with a Difficult Client PMO

    Ten ways to keep your client happy, protect your construction programme and build stronger working relationships.Every construction planner knows that keeping the client happy matters. But what…

    Sunchana Johnston

    17 Oct 2026
  • PROCEDURES No 16 – Quality Standards

    Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…

    PP Admin

    23 Aug 2026
  • Sunchana’s P6 Lancelot Meets OPC Star Wars

    Several months ago, I was engaged as the planning lead with one of the most significant infrastructure organisations.My assignments appeared straightforward: to provide independent planning expertise and advise senior stakeholders on the most appropriate software solution to support the extensive…

    Sunchana Johnston

    10 Aug 2026
  • Programme Planning Standards: The Rules of the Game

    Programme Planning Standards: The Rules of the GameStudies consistently show that organisations with mature project management practices achieve better delivery outcomes than those with ad hoc approaches. Yet one of the simplest disciplines is often overlooked—agreeing a common Programme Planning…

    Sunchana Johnston

    5 Jul 2026
  • Work = Life Priorities

    Balancing our work and home lives is a challenge that nearly everyone faces. I was a single parent for many years and managed large teams and projects in Fortune 100 companies. It was not always easy. Recently, I was talking to an old friend and former colleague. When we worked together, she did not

    Alan Zucker

    4 Dec 2020
  • Your Plan is wrong

    It is wrong from the moment you print it on paper. This is true in all aspects of life, as life happens every minute, and there are always things that you couldn’t possibly be aware of before you finalize your plan.Still, the first step of any project is to create a Plan. You’ll be asked to create…

    Abbas Shakourifar

    3 Dec 2018

Jobs

Roles asking for this

  1. ManchesterPermanent EmploymentCivil / Building / E&M
    £100-130,000
  2. MacclesfieldPermanent EmploymentCivil / Building / E&M
    £95,000
  3. LondonPermanent Employment
    TBC
  4. LondonPermanent EmploymentCivil / Building / E&M
    £120,000

Norms & Rates

Rates, norms and durations

ActivityEntry (verbatim)
005 Initiate Phase
010 Analyse Phase
015 Design Phase
020 Develop Phase
025 Test Phase
030 Implement Phase
035 Support Phase
Aluminium RoofingAluminium Roofing Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Flat Roof Aluminium Work = 2.8 m2/day Sloping Roof Aluminium Work = 1.9 m2/day

Resources

Papers, standards and tools

No resources yet

Summaries of papers, standards and tools are added by editors and appear here once published.