Open Standard · M2 Planning & Scheduling
Schedule development
Knowledge
Articles and chapters
- M6.5 — Claims & Forensic Analysis22 Oct 2026
By the end of this section, the practitioner should be able to preserve relevant records, define a forensic question, establish a reliable chronology, test cause and effect across schedule and cost, distinguish facts from assumptions and produce reproducible findings. They should understand how project-controls…
- M6.3 — Baseline Change & Configuration Control22 Oct 2026
By the end of this section, the practitioner should be able to turn a bounded approval into a verified revision of the affected scope, schedule, budget, progress, risk and configuration records. They should preserve previous baselines, maintain relationships between approved, forecast and as-built information,…
- M6.2 — Change Control22 Oct 2026
By the end of this section, the practitioner should be able to recognise a potential change, record and define it, assess integrated consequences, identify the correct authority, support an approve/reject/defer decision and track implementation to verified closure. They should distinguish a changed requirement…
- M6.1 — Project Controls Strategy & Governance22 Oct 2026
By the end of this section, the practitioner should be able to design and operate a proportionate project-controls strategy: define what decisions the project needs, identify the information and controls that support them, assign ownership and authority, establish an integrated operating cycle, set escalation…
- M5.4 — Integrated Forecasting & Predictive Analysis22 Oct 2026
By the end of this section, the practitioner should be able to produce one coherent view of expected project outcomes by reconciling schedule, cost, physical accomplishment, acceptance, commercial exposure and uncertainty. They should identify inconsistent assumptions, distinguish target from forecast, build…
- M5.3 — Integrated Cost & Schedule Performance22 Oct 2026
By the end of this section, the practitioner should be able to connect authorised scope, time-phased budget, evidence of accomplishment and incurred cost at a common cut-off. They should calculate and interpret basic Earned Value Management measures, reconcile them to source records, distinguish cost efficiency…
- M5.2 — Variance & Trend Analysis22 Oct 2026
By the end of this section, the practitioner should be able to establish a valid comparison, calculate period and cumulative variance, analyse a time series, distinguish delivery deterioration from timing or data effects, find causes across discipline boundaries and test whether an intervention improves the…
- M4.5 — Contingency & Uncertainty22 Oct 2026
By the end of this section, the practitioner should be able to establish, explain, govern and reassess cost and schedule provision for uncertainty without hiding it inside the base plan. They should be able to distinguish base budget or duration from contingency.
- M4.4 — Risk Response & Control22 Oct 2026
By the end of this section, the practitioner should be able to turn an analysed threat or opportunity into a controlled management response that is proportionate, owned, time-bound and integrated with the way the project is actually delivered.
- M4.3 — Quantitative Risk Analysis22 Oct 2026
By the end of this section, the practitioner should be able to take a defined project objective, a credible current schedule or cost model, and a selected set of material uncertainties and turn them into a transparent quantitative view of possible outcomes.
Discussions
4,589 discussions
- 1replydistributing staff on the schedulePlanning, Scheduling & Programming Discussionby Moutaz Aldeib· 12 years ago
- 1replyplanning and scheduling intervieqPlanning, Scheduling & Programming Discussionby kazeem Balogun· 12 years ago
- 1replyStudent need help in writing a paper about schedulePlanning, Scheduling & Programming Discussionby Łukasz Durniat· 12 years ago
- 1replyWorking with Sub ProjectsPlanning, Scheduling & Programming Discussionby Martyn Coates· 12 years ago
- 1replyHow all the tree structures of projects are linked ?Planning, Scheduling & Programming Discussionby Jean-Yves Moine· 12 years ago
- 1replyHow to define the Workpackages?Planning, Scheduling & Programming Discussionby Jean-Yves Moine· 12 years ago
- 1replyconcrete tracking reportsPlanning, Scheduling & Programming Discussionby Haytham Saad· 12 years ago
- 1replyShutdown Vs EPC ScheduleShutdowns / Turnarounds / Outages (STOs)by M. Kamel Bessekri· 12 years ago
- 1replyHow to Rearrange Activity ID's in an Ascending Order in Primavera P6 V6,Planning, Scheduling & Programming Discussionby Royce David Sacdalan· 12 years ago
- 1replyCost overrunPlanning, Scheduling & Programming Discussionby Mona Singh· 12 years ago
3,061–3,070 of 4,589
Blogs
Thought leadership
- How Project Planners Should Deal with a Difficult Client PMO17 Oct 2026
Ten ways to keep your client happy, protect your construction programme and build stronger working relationships.Every construction planner knows that keeping the client happy matters. But what…
Sunchana Johnston
- PROCEDURES No 16 – Quality Standards23 Aug 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- Sunchana’s P6 Lancelot Meets OPC Star Wars10 Aug 2026
Several months ago, I was engaged as the planning lead with one of the most significant infrastructure organisations.My assignments appeared straightforward: to provide independent planning expertise and advise senior stakeholders on the most appropriate software solution to support the extensive…
Sunchana Johnston
- PROCEDURES No 15 – Planning Standards10 Aug 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- PROCEDURES No 14 – Minimum Planning Expectations from THE MANAGEMENT!20 Jul 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- Programme Planning Standards: The Rules of the Game5 Jul 2026
Programme Planning Standards: The Rules of the GameStudies consistently show that organisations with mature project management practices achieve better delivery outcomes than those with ad hoc approaches. Yet one of the simplest disciplines is often overlooked—agreeing a common Programme Planning…
Sunchana Johnston
Jobs
Roles asking for this
- Planning Planet LondonPermanent EmploymentTBC
- London (EU.UK.LON)Permanent EmploymentCivil / Building / E&M£85,000 + car or allowance (circa £6,500) + excellent staff benefits
- Planning Planet London (EU.UK.LON)Contract or PermanentRailway£55K or Day Rate
- United Kingdom (EU.UK)Contract or PermanentCivil / Building / E&MSalary: £50,000–£75,000
- United Kingdom (EU.UK)Permanent EmploymentOil / Gas / Power£75,000 – £90,000 + car or allowance (circa £6,500) + staff benefits
- Surrey (EU.UK.SRY)Permanent EmploymentConsulting / TransformationInitial salary £60,000 to £70,000
Norms & Rates
Rates, norms and durations
| Activity | Entry (verbatim) | Section | Source |
|---|---|---|---|
| 005 Initiate Phase | IT Engineering Projects | 005 Initiate Phase | |
| 010 Analyse Phase | IT Engineering Projects | 010 Analyse Phase | |
| 015 Design Phase | IT Engineering Projects | 015 Design Phase | |
| 020 Develop Phase | IT Engineering Projects | 020 Develop Phase | |
| 025 Test Phase | IT Engineering Projects | 025 Test Phase | |
| 030 Implement Phase | IT Engineering Projects | 030 Implement Phase | |
| 035 Support Phase | IT Engineering Projects | 035 Support Phase | |
| Aluminium Roofing | Aluminium Roofing Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Flat Roof Aluminium Work = 2.8 m2/day Sloping Roof Aluminium Work = 1.9 m2/day | Metal Roof Decking | Aluminium Roofing |
Resources
Papers, standards and tools
No resources yet
Summaries of papers, standards and tools are added by editors and appear here once published.