Skip to content

Blog · Filed under

4D

1 article
4D

Building a 4D Strategy on Top of VDC Principles

I like to think of Virtual Design & Construction (VDC) as a process that ideally flows through a project, digitally (i.e., virtually) creating, collecting, transporting, and delivering project data from design through construction. The VDC process includes software, hardware, and people – ideally al

21 Nov 2014 · Jon Berkoe · 2 min read