Primavera p6 WBS grouping bands in excel

PLeae find the below Youtube link for the video how to prepare color bands of WBS in excel with one clickhttps://youtu.be/1jByS22FXJY

13 Jun 2020 · Farooq shaik · 1 min read

P6

Primavera Tips and Tricks - Tracing logic to a targeted activity using Primavera P6

Primavera Tips and TricksTracing logic to a targeted activity using Primavera P6Project Controls – Planning and SchedulingJuly 2018 By David H. Doughty, PSPIntroduction:In this post, I will show you how trace logic to a targeted activity on your project by utilizing Multiple Float Path functionality

25 Jul 2018 · David Doughty · 3 min read

P6

Calculations of Summary Original Durations in Primavera P6

By Yaser A. Al-Bustanji CPCM, ACIArb, PMP, PMI-SP, PMI-RMP, November, 2017IntroductionThis article is a simple guide to understand the data stored in the P6 Original Duration fields that appear in all summary bands such as Project, WBS, Resources and Activity Codes.

27 Nov 2017 · Yaser A. Al-Bustanji · 2 min read

P6

How to define Resource Productivity in Primavera P6 and create schedule

When create a schedule, we can based on Resource Productivity to estimate duration.For example:We have a team which can cast 10 m3 of concrete per day (This is Productivity)We have an Foundation which take 100 m3 concrete.Duration of Foundation activity will be 100 / 10 = 10 daysNow we will do it in

24 Nov 2017 · Khuong Do · 1 min read