Why so many poor schedules?

Why so many poor schedules?Schedule logic is not the issue, what makes our schedule models so poor is how we deal with resources. Without resources nothing is done. Schedules that do not take into account all resource constraints are incomplete and most probably wrong.We favor simplicity over substa

11 Aug 2017 · Rafael Davila · 2 min read

Resource Leveling

Determine the longest path of a resource leveled schedule in P6

Unfortunately when it comes to resources and resource leveling, P6 model is absolute. P6 doesn’t calculate the float correctly and the longest path will not be accurate since the late and early dates will not change after leveling.Primavera P6 doesn’t take in consideration the new dates after the le

25 Aug 2016 · Assem Osman · 6 min read