Skip to content

Open Standard · M2 Planning & Scheduling

M2.1 Planning & Schedule Development

By the end of this section, the learner should be able to turn authorised scope and an agreed delivery strategy into a credible, structured and maintainable project schedule that explains what work must be performed, in what broad sequence, over what durations and calendars, through which interfaces and milestones, and with enough detail to support later logic analysis, resource assessment, progress updating, forecasting and control.
346 knowledge pages16,283 discussions1 blogs202 normsRead M2.1 in the Open Standard text

Knowledge

Articles and chapters

  • M2.5 — Schedule Forecasting & Analysis

    By the end of this section, the learner should be able to take a credible current schedule and use it to forecast likely future outcomes, explain what is driving those outcomes, test alternative scenarios, assess the effect of uncertainty and management interventions.

    21 Oct 2026
  • M2.4 — Progress Updating & Schedule Control

    1. Practical outcomeBy the end of this section, the learner should be able to take an approved schedule and turn it into a trustworthy current control model at each reporting cycle. They should be able to establish a clear data date, collect and validate actual progress, record actual starts and acomplishments.

    21 Oct 2026
  • M2.3 — Resources, Productivity & Schedule Optimisation

    By the end of this section, the learner should be able to test whether a logically valid schedule is actually deliverable with the people, skills, equipment, facilities and other constrained resources available to the project. They should be able to distinguish resource demand from capacity.

    21 Oct 2026
  • M2.2 — Logic, Critical Path & Float

    The learner should be able to construct and analyse a logically linked schedule, choose relationships, recognise missing or inappropriate logic, distinguish logic from constraints, identify critical and near-critical paths, understand total and free float, recognise negative or unusually high float.

    21 Oct 2026
  • M1.2 — Coding & Control Structures

    By the end of this section, the practitioner should be able to design and apply a coherent set of coding and control structures that allows project information to be organised, integrated, aggregated, reconciled and reported without repeatedly rebuilding the underlying data.

    21 Oct 2026
  • M1.3 — Integrated Baselines

    By the end of this section, the practitioner should be able to establish, test and explain an integrated project baseline that brings authorised scope, schedule, budget, assumptions, progress rules and accountability into one coherent reference position.

    21 Oct 2026
  • M1.5 — Data Quality, Integration & Traceability

    By the end of this section, the learner should be able to establish and operate a project-controls data environment in which important information is complete enough, accurate enough, timely enough, consistent enough and traceable enough to support management decisions.

    21 Oct 2026
  • M2.1 — Planning & Schedule Development

    By the end of this section, the learner should be able to turn authorised scope and an agreed delivery strategy into a credible, structured and maintainable project schedule that explains what work must be performed, in what broad sequence, and over what durations and calendars etc.

    21 Oct 2026
  • M1.1 — Scope & Work Breakdown Structures

    By the end of this section, the practitioner should be able to take an authorised project scope and turn it into a Work Breakdown Structure.

    21 Oct 2026
  • M1.4 — Progress Measurement

    By the end of this section, the learner should be able to design, apply and challenge progress-measurement rules that convert evidence of completed work into a credible statement of physical accomplishment. They should be able to choose an appropriate measurement method.

    21 Oct 2026

Discussions

16,275 discussions

  1. 11replies
    4D Programming
    Planning, Scheduling & Programming Discussionby Andrew Owenson· 15 years ago
  2. 11replies
    a thought of a someone wants to be a planner
    Asta Powerprojectby Mike planner· 15 years ago
  3. 11replies
    How to organize the WBS in P6????????/
    Oracle Primavera - PM6by Pranab Kumar Deb· 15 years ago
  4. 11replies
    Monitoring of Works on Linear Projects
    Planning, Scheduling & Programming Discussionby Wee Nit Som Nok· 16 years ago
  5. 11replies
    How to update a schedule?
    Planning, Scheduling & Programming Discussionby Raul Santos· 16 years ago
  6. 11replies
    % Complete type
    Oracle Primavera - PM6by Shazia khan· 16 years ago
  7. 11replies
    P6 Limitations or Explanation?
    Oracle Primavera - PM6by Kas DaAce· 16 years ago
  8. 11replies
    The Oracle Primavera Support Community is now live!
    Primavera Project Planner - P3by Tony Banks· 16 years ago
  9. 11replies
    Steps - User defined text
    Oracle Primavera - PM6by Haresh Jayanth· 16 years ago
  10. 11replies
    portfolio in P6
    Oracle Primavera - PM6by Haresh Jayanth· 16 years ago

1,161–1,170 of 16,275

Blogs

Thought leadership

  • How Project Planners Should Deal with a Difficult Client PMO

    Ten ways to keep your client happy, protect your construction programme and build stronger working relationships.Every construction planner knows that keeping the client happy matters. But what…

    Sunchana Johnston

    17 Oct 2026
  • PROCEDURES No 16 – Quality Standards

    Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…

    PP Admin

    23 Aug 2026
  • Sunchana’s P6 Lancelot Meets OPC Star Wars

    Several months ago, I was engaged as the planning lead with one of the most significant infrastructure organisations.My assignments appeared straightforward: to provide independent planning expertise and advise senior stakeholders on the most appropriate software solution to support the extensive…

    Sunchana Johnston

    10 Aug 2026
  • PROCEDURES No 15 – Planning Standards

    Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…

    PP Admin

    10 Aug 2026
  • PROCEDURES No 14 – Minimum Planning Expectations from THE MANAGEMENT!

    Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…

    PP Admin

    20 Jul 2026
  • Programme Planning Standards: The Rules of the Game

    Programme Planning Standards: The Rules of the GameStudies consistently show that organisations with mature project management practices achieve better delivery outcomes than those with ad hoc approaches. Yet one of the simplest disciplines is often overlooked—agreeing a common Programme Planning…

    Sunchana Johnston

    5 Jul 2026

Jobs

Roles asking for this

  1. ManchesterPermanent EmploymentCivil / Building / E&M
    £100-130,000
  2. MacclesfieldPermanent EmploymentCivil / Building / E&M
    £95,000
  3. LondonPermanent Employment
    TBC
  4. LondonPermanent EmploymentCivil / Building / E&M
    £120,000

Norms & Rates

Rates, norms and durations

ActivityEntry (verbatim)
005 Initiate Phase
010 Analyse Phase
015 Design Phase
020 Develop Phase
025 Test Phase
030 Implement Phase
035 Support Phase
Aluminium RoofingAluminium Roofing Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Flat Roof Aluminium Work = 2.8 m2/day Sloping Roof Aluminium Work = 1.9 m2/day

Resources

Papers, standards and tools

No resources yet

Summaries of papers, standards and tools are added by editors and appear here once published.