M2.1 Planning & Schedule Development

By the end of this section, the learner should be able to turn authorised scope and an agreed delivery strategy into a credible, structured and maintainable project schedule that explains what work must be performed, in what broad sequence, over what durations and calendars, through which interfaces and milestones, and with enough detail to support later logic analysis, resource assessment, progress updating, forecasting and control.
347 knowledge pages16,283 discussions1 blogs202 normsRead M2.1 in the Open Standard text

Knowledge

Articles and chapters

  • M6.5 — Claims & Forensic Analysis

    By the end of this section, the practitioner should be able to preserve relevant records, define a forensic question, establish a reliable chronology, test cause and effect across schedule and cost, distinguish facts from assumptions and produce reproducible findings. They should understand how project-controls…

    22 Oct 2026
  • M6.3 — Baseline Change & Configuration Control

    By the end of this section, the practitioner should be able to turn a bounded approval into a verified revision of the affected scope, schedule, budget, progress, risk and configuration records. They should preserve previous baselines, maintain relationships between approved, forecast and as-built information,…

    22 Oct 2026
  • M6.2 — Change Control

    By the end of this section, the practitioner should be able to recognise a potential change, record and define it, assess integrated consequences, identify the correct authority, support an approve/reject/defer decision and track implementation to verified closure. They should distinguish a changed requirement…

    22 Oct 2026
  • M6.1 — Project Controls Strategy & Governance

    By the end of this section, the practitioner should be able to design and operate a proportionate project-controls strategy: define what decisions the project needs, identify the information and controls that support them, assign ownership and authority, establish an integrated operating cycle, set escalation…

    22 Oct 2026
  • M5.4 — Integrated Forecasting & Predictive Analysis

    By the end of this section, the practitioner should be able to produce one coherent view of expected project outcomes by reconciling schedule, cost, physical accomplishment, acceptance, commercial exposure and uncertainty. They should identify inconsistent assumptions, distinguish target from forecast, build…

    22 Oct 2026
  • M5.3 — Integrated Cost & Schedule Performance

    By the end of this section, the practitioner should be able to connect authorised scope, time-phased budget, evidence of accomplishment and incurred cost at a common cut-off. They should calculate and interpret basic Earned Value Management measures, reconcile them to source records, distinguish cost efficiency…

    22 Oct 2026
  • M5.2 — Variance & Trend Analysis

    By the end of this section, the practitioner should be able to establish a valid comparison, calculate period and cumulative variance, analyse a time series, distinguish delivery deterioration from timing or data effects, find causes across discipline boundaries and test whether an intervention improves the…

    22 Oct 2026
  • M4.5 — Contingency & Uncertainty

    By the end of this section, the practitioner should be able to establish, explain, govern and reassess cost and schedule provision for uncertainty without hiding it inside the base plan. They should be able to distinguish base budget or duration from contingency.

    22 Oct 2026
  • M4.4 — Risk Response & Control

    By the end of this section, the practitioner should be able to turn an analysed threat or opportunity into a controlled management response that is proportionate, owned, time-bound and integrated with the way the project is actually delivered.

    22 Oct 2026
  • M4.3 — Quantitative Risk Analysis

    By the end of this section, the practitioner should be able to take a defined project objective, a credible current schedule or cost model, and a selected set of material uncertainties and turn them into a transparent quantitative view of possible outcomes.

    22 Oct 2026

Discussions

16,274 discussions

  1. 2replies
    Absence of proper Longest Path in a Schedule with many milestones
    Oracle Primavera - PM6by Gulshan Kriplani· 13 years ago
  2. 2replies
    Create a No Predecessor filter in Primavera
    Oracle Primavera - PM6by Mohamed zaied· 13 years ago
  3. 2replies
    Early Star and Early Finish
    Oracle Primavera - PM6by Moutaz Aldeib· 13 years ago
  4. 2replies
    Need Help with Event Code: 90C0432B During Baseline Updates
    Oracle Primavera - PM6by JJ Aucoin· 13 years ago
  5. 2replies
    Change the Activity ID of Various Series of Activities in P6.2
    Oracle Primavera - PM6by Pranab Kumar Deb· 13 years ago
  6. 2replies
    Total Float question
    Planning, Scheduling & Programming Discussionby Joseph Matta· 13 years ago
  7. 2replies
    Multi User Problems
    Oracle Primavera - PM6by George Gray· 13 years ago
  8. 2replies
    UN/CEFACT XML schema format, a software-neutral format, is it for real?
    Planning, Scheduling & Programming Discussionby Rafael Davila· 13 years ago
  9. 2replies
    Showing "day of the week" in separate column next to date
    Oracle Primavera - PM6by Bob Foden· 13 years ago
  10. 2replies
    Critical Path
    Planning, Scheduling & Programming Discussionby Jerwin Chong· 13 years ago

8,671–8,680 of 16,274

Blogs

Thought leadership

  • How to Become a P6 Project Planner: From Beginner to Senior Planner

    Learning the basics of Primavera P6 is easy. Learning how to plan and control real projects takes years.Many industries share the misconception that learning Primavera P6 makes someone a project…

    Sunchana Johnston

    28 Oct 2026
  • How Project Planners Should Deal with a Difficult Client PMO

    Ten ways to keep your client happy, protect your construction programme and build stronger working relationships.Every construction planner knows that keeping the client happy matters. But what…

    Sunchana Johnston

    17 Oct 2026
  • PROCEDURES No 16 – Quality Standards

    Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…

    PP Admin

    23 Aug 2026
  • Sunchana’s P6 Lancelot Meets OPC Star Wars

    Several months ago, I was engaged as the planning lead with one of the most significant infrastructure organisations.My assignments appeared straightforward: to provide independent planning expertise and advise senior stakeholders on the most appropriate software solution to support the extensive…

    Sunchana Johnston

    10 Aug 2026
  • PROCEDURES No 15 – Planning Standards

    Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…

    PP Admin

    10 Aug 2026
  • PROCEDURES No 14 – Minimum Planning Expectations from THE MANAGEMENT!

    Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…

    PP Admin

    20 Jul 2026

Jobs

Roles asking for this

  1. London (EU.UK.LON)Permanent EmploymentCivil / Building / E&M
    £85,000 + car or allowance (circa £6,500) + excellent staff benefits
  2. Planning Planet LondonPermanent Employment
    TBC
  3. Planning Planet London (EU.UK.LON)Contract EmploymentCivil / Building / E&M
    £510/day + accommodation allowance
  4. Planning Planet London (EU.UK.LON)Contract or PermanentRailway
    £55K or Day Rate
  5. United Kingdom (EU.UK)Contract or PermanentCivil / Building / E&M
    Salary: £50,000–£75,000
  6. United Kingdom (EU.UK)Permanent EmploymentOil / Gas / Power
    £75,000 – £90,000 + car or allowance (circa £6,500) + staff benefits

Norms & Rates

Rates, norms and durations

ActivityEntry (verbatim)
005 Initiate Phase
010 Analyse Phase
015 Design Phase
020 Develop Phase
025 Test Phase
030 Implement Phase
035 Support Phase
Aluminium RoofingAluminium Roofing Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Flat Roof Aluminium Work = 2.8 m2/day Sloping Roof Aluminium Work = 1.9 m2/day