Open Standard · M2 Planning & Scheduling
M2.1 Planning & Schedule Development
Knowledge
Articles and chapters
- M5 — Performance Management & Reporting21 Oct 2026
Module 5 establishes the essential practices for measuring, analysing, forecasting and communicating project performance. It explains how to develop meaningful performance measures across scope, schedule, cost, progress, risk and resources, and apply techniques such as Earned Value Management to assess delivery against approved baselines. It also covers how to identify and explain variances, analyse trends and root causes, develop credible forecasts, and determine effective corrective actions. Finally, it explains how to turn reliable project data into clear, consistent and decision-focused management information. Together, these practices provide a structured foundation for understanding project performance, identifying emerging issues, anticipating future outcomes and supporting timely, evidence-based decisions to improve delivery throughout the project lifecycle.
- M4 — Risk & Uncertainty21 Oct 2026
Module 4 establishes the essential practices for identifying, assessing, managing and responding to project risks and opportunities throughout the project lifecycle. It explains how to establish a structured risk management framework, evaluate and prioritise uncertainties using qualitative and quantitative analysis, and understand their potential impact on project cost, schedule and delivery outcomes. It also covers how to develop effective risk responses, assign ownership, integrate mitigation actions into project plans, and determine appropriate levels of contingency and confidence. Together, these practices provide a consistent and proactive foundation for managing uncertainty, anticipating potential threats and opportunities, improving forecast confidence and supporting informed, risk-based decisions to protect project objectives and delivery performance.
- M3 — Cost & Estimating21 Oct 2026
Module 3 establishes the essential practices for estimating, budgeting, forecasting and controlling project costs. It explains how to translate project scope into credible cost estimates using appropriate methods, document the underlying assumptions and uncertainties, and establish authorised budgets aligned with the project schedule and delivery strategy. It also covers how to monitor actual expenditure, commitments and emerging changes, develop reliable forecasts of the likely final cost, and identify and analyse cost variances and trends. Together, these practices provide a consistent and transparent foundation for managing project expenditure, understanding cost performance, anticipating financial pressures and supporting informed decisions to maintain affordability and cost control throughout the project lifecycle.
- M1 — Scope, Data & Baselines21 Oct 2026
Module 1 establishes the essential building blocks for effective project controls. It explains how to define and structure project scope through a Work Breakdown Structure (WBS), establish consistent coding and control structures, and integrate scope, schedule, cost and responsibilities into an approved baseline. It also covers how to measure physical progress using objective evidence, distinguish actual performance from forecasts, and maintain reliable, traceable project data. Together, these practices provide a consistent and trustworthy foundation for planning, monitoring, reporting, decision-making and controlling change throughout the project lifecycle.
- M2 — Planning & Scheduling21 Oct 2026
Module 2 establishes the essential practices for developing, managing and controlling credible project schedules. It explains how to translate project scope into a structured schedule, establish logical relationships, identify critical and near-critical paths, and understand float and milestone dependencies. It also covers how to assess resource availability, productivity and delivery constraints, optimise schedules, and maintain accurate progress updates using objective evidence. Finally, it explains how to analyse schedule performance, forecast likely completion dates, identify emerging risks and evaluate recovery options. Together, these practices provide a reliable foundation for understanding project timelines, monitoring delivery performance, anticipating delays and supporting informed decisions to keep projects on track.
- M2.5 — Schedule Forecasting & Analysis21 Oct 2026
By the end of this section, the learner should be able to take a credible current schedule and use it to forecast likely future outcomes, explain what is driving those outcomes, test alternative scenarios, assess the effect of uncertainty and management interventions.
- M2.4 — Progress Updating & Schedule Control21 Oct 2026
1. Practical outcomeBy the end of this section, the learner should be able to take an approved schedule and turn it into a trustworthy current control model at each reporting cycle. They should be able to establish a clear data date, collect and validate actual progress, record actual starts and acomplishments.
- M2.3 — Resources, Productivity & Schedule Optimisation21 Oct 2026
By the end of this section, the learner should be able to test whether a logically valid schedule is actually deliverable with the people, skills, equipment, facilities and other constrained resources available to the project. They should be able to distinguish resource demand from capacity.
- M2.2 — Logic, Critical Path & Float21 Oct 2026
The learner should be able to construct and analyse a logically linked schedule, choose relationships, recognise missing or inappropriate logic, distinguish logic from constraints, identify critical and near-critical paths, understand total and free float, recognise negative or unusually high float.
- M1.2 — Coding & Control Structures21 Oct 2026
By the end of this section, the practitioner should be able to design and apply a coherent set of coding and control structures that allows project information to be organised, integrated, aggregated, reconciled and reported without repeatedly rebuilding the underlying data.
Discussions
16,275 discussions
- 11replieslogoPrimavera Project Planner - P3by Hemanth Kumar· 18 years ago
- 11repliesRussian TranslationPrimavera Project Planner - P3by Karen Smith· 19 years ago
- 11repliesUnable to open filePrimavera Project Planner - P3by Jeff Chu· 19 years ago
- 11repliesCasino RoyalePlanning, Scheduling & Programming Discussionby Armando Moriles· 19 years ago
- 11repliesP5 Installation helpOracle Primavera - PM6by Ulysses Garcia· 19 years ago
- 11repliesTechniques for Deciding Duration of ActivitesPlanning, Scheduling & Programming Discussionby Vijayendra Surve· 19 years ago
- 11repliesA quick response needed!Oracle Primavera - PM6by Oliver Melling· 19 years ago
- 11repliesP3 Vs P5Primavera Project Planner - P3by Suresh Devarajan· 19 years ago
- 11repliesRolling Up Summary TasksMicrosoft Projectby Tony McClennon· 19 years ago
- 11repliesMultiple instances of P3Primavera Project Planner - P3by Sajid Balma· 19 years ago
1,211–1,220 of 16,275
Blogs
Thought leadership
- How Project Planners Should Deal with a Difficult Client PMO17 Oct 2026
Ten ways to keep your client happy, protect your construction programme and build stronger working relationships.Every construction planner knows that keeping the client happy matters. But what…
Sunchana Johnston
- PROCEDURES No 16 – Quality Standards23 Aug 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- Sunchana’s P6 Lancelot Meets OPC Star Wars10 Aug 2026
Several months ago, I was engaged as the planning lead with one of the most significant infrastructure organisations.My assignments appeared straightforward: to provide independent planning expertise and advise senior stakeholders on the most appropriate software solution to support the extensive…
Sunchana Johnston
- PROCEDURES No 15 – Planning Standards10 Aug 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- PROCEDURES No 14 – Minimum Planning Expectations from THE MANAGEMENT!20 Jul 2026
Fed up with adverts from software companies and consultancies that are going to change the world of Planning and solve all your project problems? This series of occasional articles promises nothing but thought provoking questions on how well we understand the basics of our profession from the…
PP Admin
- Programme Planning Standards: The Rules of the Game5 Jul 2026
Programme Planning Standards: The Rules of the GameStudies consistently show that organisations with mature project management practices achieve better delivery outcomes than those with ad hoc approaches. Yet one of the simplest disciplines is often overlooked—agreeing a common Programme Planning…
Sunchana Johnston
Jobs
Roles asking for this
- ManchesterPermanent EmploymentCivil / Building / E&M£100-130,000
- MacclesfieldPermanent EmploymentCivil / Building / E&M£95,000
- LondonPermanent EmploymentTBC
- LondonPermanent EmploymentCivil / Building / E&M£120,000
Norms & Rates
Rates, norms and durations
| Activity | Entry (verbatim) | Section | Source |
|---|---|---|---|
| 005 Initiate Phase | IT Engineering Projects | 005 Initiate Phase | |
| 010 Analyse Phase | IT Engineering Projects | 010 Analyse Phase | |
| 015 Design Phase | IT Engineering Projects | 015 Design Phase | |
| 020 Develop Phase | IT Engineering Projects | 020 Develop Phase | |
| 025 Test Phase | IT Engineering Projects | 025 Test Phase | |
| 030 Implement Phase | IT Engineering Projects | 030 Implement Phase | |
| 035 Support Phase | IT Engineering Projects | 035 Support Phase | |
| Aluminium Roofing | Aluminium Roofing Metal roof works are usually carried out with 2 men gangs of skilled labour. The rates do not include for the timber backing structures etc. Flat Roof Aluminium Work = 2.8 m2/day Sloping Roof Aluminium Work = 1.9 m2/day | Metal Roof Decking | Aluminium Roofing |
Resources
Papers, standards and tools
No resources yet
Summaries of papers, standards and tools are added by editors and appear here once published.